Company News

Hunan Great Steel Pipe Co., Ltd
316L stainless steel pipe,carbon steel pipe supplier,alloy steel pipes

Production of Stainless Steel Seamless Pipe Production Process and Steps

Date: 2022-05-24
Production of Stainless Steel Seamless Pipe Production Process and Steps The process of making stainless steel seamless pipe: 1, steelmaking → 2, rolling round steel → 3, perforation (annealing) → 4, cold drawn → 5, cold rolling (annealing, demagnetization, pickling, cleaning) → 6, wall polishing → 7, outer wall polishing → 8, air pressure detection → 9, surface detection → 10, posted trademarks and certificates → 11, packaging → 12, factory Stainless steel seamless pipe production steps: 1, The selection of quality standards of 304,316 L stainless steel raw material tube by the air, head, annealing and other operations. 2, After the completion of the above operation is followed by multi-pass cold drawn (cold rolling) process, the cold-rolled pipe in the multi-roll mill on the stainless steel pipe in the variable section of the circular hole and the non-moving cone-shaped head Ring-type rolling. 3, After cold-rolled stainless steel pipe will appear strong yield coefficient, not flaring, bending and other phenomena, in order to achieve stainless steel pipe sanitary standards, cold-rolled pipe after the need for bright annealing, demagnetization, pickling, correction Wait straight step. 4, Stainless steel tube pickling process, the pipe in the pickling passivation at the same time to remove the surface of the workpiece oil, rust, welding spot, oxide, free iron and other dirt, the surface after treatment into a uniform silver white, while preventing metal Over corrosion and hydrogen embrittlement phenomenon, inhibit the generation of acid mist. 5, Stainless steel tube after the above process, the next is the polishing process, the inner wall of the pipe, the outer wall polishing the standard number of 400 mesh, polished finish inside and outside the tube surface finish up to the mirror standard (that is, health standards). 6, After polishing the stainless steel pipe through the metal testing machine (or water pressure test) for internal testing and steel pipe inspectors strict manual selection, qualified products to packaging factory. Note: stainless steel seamless pipe with sub-cold-rolled tube and hot-rolled tube, for the size requirements and high quality requirements of stainless steel sanitary seamless pipe, must be cold-rolled, cold drawn or the combination of the two production process. Post time: May-24-2022

Latest news list

  • FBE steel pipe field joint coating,FBE pipe welding protection,field joint coating,FBE coating repair,FBE field joint inspection
    FBE (fusion-bonded epoxy) coating provides external corrosion protection for steel pipes used in pipeline projects,However,during pipeline construction,the coating near pipe ends must be protected while individual pipe sections are joined by welding,The exposed joint area then requires a suitable field joint coating system,If this work is not properly controlled,damage or poor bonding at the joint can compromise the continuity of the pipeline's corrosion protection,Protecting the factory coating and applying the correct field joint system are therefore important parts of pipeline construction,
  • how to choose FBE coated steel pipe,FBE pipe selection,FBE coated pipeline requirements,FBE coated steel pipe size,FBE coated steel pipe purchase
    Selecting FBE coated steel pipes for a pipeline project involves more than specifying pipe diameter,wall thickness and coating thickness,Buyers must consider the base pipe,coating system,operating environment,installation conditions and inspection requirements as one coordinated package,A well-defined purchase specification helps prevent material mismatches,coating defects and documentation gaps before production begins,The following points provide a practical checklist for engineers,EPC contractors and procurement teams,
  • FBE coating and cathodic protection,FBE coated steel pipe,external pipeline corrosion control,cathodic protection monitoring,FBE coating disbondment
    Buried steel pipelines are exposed to moisture,soil chemicals and other environmental conditions that can cause external corrosion,To reduce this risk,pipeline projects commonly combine external fusion-bonded epoxy (FBE) coating with cathodic protection (CP),Although both methods help protect steel against corrosion,they work in different ways,FBE coating provides a physical barrier between the pipe surface and its surroundings,while cathodic protection uses an electrochemical process to reduce corrosion at exposed areas,Their effectiveness depends on proper design,installation,inspection and long-term monitoring,
  • FBE coated steel pipe quality control,FBE coating inspection,FBE coating thickness measurement,FBE pipe inspection,FBE coating quality control
    The quality of an FBE (Fusion Bonded Epoxy) coated steel pipe cannot be judged by its appearance alone,A smooth coating surface does not necessarily mean that the coating has achieved the required thickness,adhesion,or curing condition,For pipeline applications,quality control starts with the incoming bare steel pipe and continues through surface preparation,coating application,curing,and final inspection,Each stage should follow an approved procedure and the requirements specified for the project,A documented inspection process also allows buyers to verify that the supplied pipes meet the agreed technical requirements,
  • FBE coated steel pipes for buried pipelines,buried pipeline corrosion protection,FBE coated steel pipe installation
    FBE (Fusion Bonded Epoxy) coating is widely used to protect steel pipes against external corrosion in buried pipeline systems,It forms a protective barrier between the steel surface and the surrounding soil,However,coating performance depends on more than the quality of the factory-applied layer,Soil conditions,transportation,installation,field joint protection and cathodic protection all affect the long-term integrity of a buried pipeline,A reliable protection strategy should address these factors before the pipe is placed underground,