Product News

Hunan Great Steel Pipe Co., Ltd
smls pipe,stainless steel pipe,electric resistance welded

STEEL PIPE PRICE LIST

Date: 2024-06-12
STEEL PIPE PRICE LIST Product price list (price unit: RMB) American standard: API 5L, ASTM A106/A53 German standard: DIN 1629 Material: 20#, Gr.B, ST44 Note: The above price is for 6M steel pipe length. 2.5-inch to 12-inch 5.8-meter fixed length is increased by 100 yuan per ton, and the others remain unchanged. In addition, the length needs to be calculated separately. The above price includes black paint, plastic caps at both ends, hexagonal steel strapping packaging, tax-inclusive unit price to Tianjin Port; ≤1-1/2″ flat ends, ≥2″ bevel ends (30-35°). In addition to the above standards, we can also produce seamless steel pipes of various standards according to JIS Japanese standards, BS British standards, EN European standards and customer requirements, and the price is negotiable. Sincerely welcome new and old customers to cooperate with our company! Post time: Jun-12-2024 N.D. O.D. (MM) SCH40 SCH40 SCH40 SCH40 SCH80 SCH80 SCH80 N.D. O.D. (MM) W.T. Weight Price W.T. W.T. Weight Price N.D. O.D. (MM) (MM) (KG/M) (Yuan/ton) (MM) (MM) (KG/M) (Yuan/ton) 1/4″ 13.7 2.24 0.63 8100 3.02 3.02 0.8 8100 3/8″ 17.1 2.31 0.84 7100 3.2 3.2 1.1 7100 1/2″ 21.3 2.77 1.27 5850 3.73 3.73 1.62 5850 3/4″ 26.7 2.87 1.69 5650 3.91 3.91 2.2 5650 1″ 33.4 3.38 2.5 4950 4.55 4.55 3.24 4950 1-1/4” 42.2 3.56 3.39 4700 4.85 4.85 4.47 4700 1-1/2″ 48.3 3.68 4.05 4650 5.08 5.08 5.41 4650 2″ 60.3 3.91 5.44 4600 5.54 5.54 7.48 4600 2-1/2″ 73 5.16 8.63 4720 7.01 7.01 11.41 4720 3″ 88.9 5.49 11.29 4700 7.62 7.62 15.27 4700 4″ 114.3 6.02 16.07 4670 8.56 8.56 22.32 4670 5” 141.3 6.55 21.77 4620 9.53 9.53 30.97 4620 6″ 168.3 7.11 28.26 4570 10.97 10.97 42.56 4570 8″ 219.1 8.18 42.55 4580 12.7 12.7 64.64 4580 10″ 273 9.27 60.31 4540 15.09 15.09 96.01 4540 12″ 323.8 10.31 79.73 4590 17.48 17.48 132.08 4590 14” 355.6 11.13 94.55 5000 19.05 19.05 158.1 5000 16” 406.4 12.7 123.3 5000 21.44 21.44 203.53 5000 18” 457.2 14.27 155.8 5000 23.88 23.88 254.55 20” 508 15.09 183.42 5050 26.19 26.19 311.17 24” 609.6 17.48 255.41 5150 30.96 30.96 442.08

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.