Industry News

Hunan Great Steel Pipe Co., Ltd
coated carbon pipe,ssaw steel pipe,ERW steel pipe supplier

Seamless Steel Pipe Price June 24th 2021

Date: 2021-06-25
Seamless Steel Pipe Price June 24th 2021 Post time: Jun-25-2021 API 5L/ASTM A106 GR.B, Seamless Carbon Steel Pipe API 5L/ASTM A106 GR.B, Seamless Carbon Steel Pipe API 5L/ASTM A106 GR.B, Seamless Carbon Steel Pipe API 5L/ASTM A106 GR.B, Seamless Carbon Steel Pipe API 5L/ASTM A106 GR.B, Seamless Carbon Steel Pipe API 5L/ASTM A106 GR.B, Seamless Carbon Steel Pipe API 5L/ASTM A106 GR.B, Seamless Carbon Steel Pipe API 5L/ASTM A106 GR.B, Seamless Carbon Steel Pipe 公称通径 DN 外径OD(mm) SCH40(6m/5.8m) SCH40(6m/5.8m) SCH80(6m/5.8m) SCH80(6m/5.8m) SCH160(6m/5.8m) SCH160(6m/5.8m) 公称通径 DN 外径OD(mm) SCH40(6m/5.8m) SCH40(6m/5.8m) SCH80(6m/5.8m) SCH80(6m/5.8m) SCH160(6m/5.8m) SCH160(6m/5.8m) 壁厚WT FOB 壁厚WT FOB 壁厚WT FOB 公称通径 DN 外径OD(mm) (mm) USD/TON (mm) USD/TON (mm) USD/TON 公称通径 DN 外径OD(mm) 1/4” 13.7 2.24 1,560.39 3.02 1,560.39 / / 3/8” 17.1 2.31 1,405.35 3.2 1,405.35 / / 1/2” 21.3 2.77 1,157.29 3.73 1,157.29 4.78 1,219.30 3/4” 26.7 2.87 1,126.28 3.91 1,126.28 5.56 1,188.29 1” 33.4 3.38 1,053.41 4.55 1,053.41 6.35 1,115.43 1-1/4” 42.2 3.56 1,022.40 4.85 1,022.40 6.35 1,084.42 1-1/2” 48.3 3.68 1,014.65 5.08 1,014.65 7.14 1,076.67 2” 60.3 3.91 1,006.90 5.54 1,006.90 8.74 1,068.91 2-1/2” 73 5.16 982.09 7.01 982.09 9.53 1,044.11 3” 88.9 5.49 982.09 7.62 982.09 11.13 1,044.11 3-1/2” 101.6 5.74 969.69 8.08 969.69 / / 4” 114.3 6.02 969.69 8.56 969.69 13.49 1,031.71 5” 141.3 6.55 965.04 9.53 965.04 15.88 1,027.05 6” 168.3 7.11 965.04 10.97 965.04 18.26 1,027.05 8” 219.1 8.18 957.29 12.7 957.29 23.01 1,019.30 10” 273 9.27 955.74 15.09 955.74 28.58 1,017.75 12” 323.8 10.31 963.49 17.48 986.74 33.32 1,048.76 14” 355.6 9.53 1,059.61 11.13 16” 406.4 9.53 1,059.61 12.7 18” 457 9.53 1,059.61 14.27 20” 508 9.53 1,095.27 15.09 24” 610 9.53 1,095.27 17.48 Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 4. The above price is only valid during June 25th-July 1st; 4. The above price is only valid during June 25th-July 1st; 4. The above price is only valid during June 25th-July 1st; 4. The above price is only valid during June 25th-July 1st; 4. The above price is only valid during June 25th-July 1st; 4. The above price is only valid during June 25th-July 1st; 4. The above price is only valid during June 25th-July 1st; 4. The above price is only valid during June 25th-July 1st; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 6. For more information and CIF prcie, please contact us; 6. For more information and CIF prcie, please contact us; 6. For more information and CIF prcie, please contact us; 6. For more information and CIF prcie, please contact us; 6. For more information and CIF prcie, please contact us; 6. For more information and CIF prcie, please contact us; 6. For more information and CIF prcie, please contact us; 6. For more information and CIF prcie, please contact us;

Latest news list

  • steel pipe fitting thermal expansion and vibration,steel elbow vibration,piping thermal movement,steel tee stress
    Steel tees,reducers and elbows operate as part of a connected piping system,When temperatures change or equipment generates vibration,loads can develop at fittings,joints,supports and equipment connections,If these effects are not properly addressed,the system may experience excessive movement,leakage or fatigue-related damage,Managing thermal expansion and vibration requires more than inspecting an individual fitting,Engineers need to consider the piping layout,operating conditions,support arrangement and the behavior of the complete system,
  • how to choose a steel tee,steel tee selection,steel tee buying guide,equal tee vs reducing tee,steel tee procurement
    Selecting a steel tee for an industrial piping project involves more than matching pipe sizes,The fitting must meet the piping layout,material specification,connection requirements and operating conditions,An incorrect specification can lead to installation delays,additional inspection or costly changes after procurement,For project buyers and engineers,the best starting point is a complete technical inquiry that defines what the piping system requires,
  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.