Price List

Hunan Great Steel Pipe Co., Ltd
SSAW steel pipe manufacturer,api casing and tubing,casing and tubing

Structural seamless pipe

Date: 2022-11-02
Structural seamless pipe Structural seamless pipe (GB/T8162-2008) is a kind of seamless steel pipe used for general structure and mechanical structure. The fluid seamless steel pipe standard applies to seamless steel pipes that transport fluids. In addition to carbon (C) elements and a certain amount of silicon (Si) (generally no more than 0.40%) and manganese (Mn) (generally no more than 0.80%, higher up to 1.20%) alloy elements for deoxidation, structural steel pipes , without other alloying elements (except residual elements). Such structural steel pipes must guarantee both chemical composition and mechanical properties. The content of sulfur (S) and phosphorus (P) impurity elements is generally controlled below 0.035%. If it is controlled below 0.030%, it is called high-grade high-quality steel, and “A” should be added after its grade, such as 20A; if P is controlled below 0.025% and S is below 0.020%, it is called super high-quality structural steel pipe, and its grade should be followed by Add “E” to distinguish. For other residual alloying elements brought into structural steel pipes from raw materials, the content of chromium (Cr), nickel (Ni), copper (Cu), etc. is generally controlled at Cr≤0.25%, Ni≤0.30%, Cu≤0.25%. Some grades of manganese (Mn) content reach 1.40%, called manganese steel. The difference between structural seamless pipe and fluid seamless pipe: The main difference between it and the structural seamless steel pipe is that the fluid seamless steel pipe is subjected to hydraulic test one by one or ultrasonic, eddy current and magnetic flux leakage inspection. Therefore, in the standard selection of pressure pipeline steel pipes, fluid seamless steel pipes should not be used. The representation method of seamless steel pipe is outer diameter, wall thickness, and thick-walled seamless steel pipe is mainly used for machining, coal mine, hydraulic steel, and other purposes. The material of thick-walled seamless steel pipe is divided into 10#, 20#, 35#, 45#, 16Mn, 27SiMn, 12Cr1MoV, 10CrMo910, 15CrMo, 35CrMo and so on. Structural stainless steel seamless pipe (GB/T14975-1994) is a hot-rolled (extruded, expansion) and cold drawn (rolled) seamless steel pipes. Due to their different manufacturing processes, seamless steel pipes are divided into hot-rolled (extruded) seamless steel pipes and cold-drawn (rolled) seamless steel pipes. Cold drawn (rolled) tubes are divided into two types: round tubes and special-shaped tubes. Process flow overview: Hot rolling (extruded seamless steel pipe): round tube billet → heating → perforation → three-roller skew rolling, continuous rolling or extrusion → tube removal → sizing (or diameter reduction) → cooling → billet tube → straightening → water pressure Test (or flaw detection) → mark → storage. Cold drawn (rolled) seamless steel pipe: round tube billet → heating → perforation → heading → annealing → pickling → oiling (copper plating) → multi-pass cold drawing (cold rolling) → billet → heat treatment → straightening → Hydraulic test (flaw detection)→marking→warehousing. Post time: Nov-02-2022

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.