Industry News

Hunan Great Steel Pipe Co., Ltd
spiral submerged arc pipe,spiral welded steel pipe,lsaw steel pipe

The Main Production Process of High-pressure Pipe

Date: 2023-04-18
The Main Production Process of High-pressure Pipe The main production process of high-pressure pipe: billet heating, perforated tube, pipe extension. High-pressure pipe rolling, pipe sizing and reducing, finishing and cooling pipe or the manufacturing method can be said Billet heating perforation heat tie pickling cold drawn carbon burning cutting head spray subscript finished packing one kind of seamless steel pipe characterized in that: setting a plurality of rolling stands having rolls to the rolling direction of mutually different configuration of multiple continuous mandrel mill, in such a seamless steel pipe manufacturing line for rolling after measuring pipe circumferential direction after rolling on the multi-point, according to the measurement results, at least control the positions of the respective ends of the shaft mandrel mill the final rolling mill roll base, so uneven wall thickness to a minimum. Usually alloy pipe> alloy tube> alloy tube> high alloy seamless steel pipe referred to by ordinary carbon steel, high carbon steel, alloy steel and common low-alloy structural steel for the production of liquid transportation pipeline or production structure, parts use. High-pressure pipe diameter and wall thickness available, there are a variety of wall thickness in the same outer diameter, the larger high-pressure pipe pressure range. Typically the length of steel, hot-rolled tube 3-12.5m, cold drawn (rolled) pipe is 1.5-9m. Post time: Apr-18-2023

Latest news list

  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,
  • oil casing manufacturing,API casing production process,oil casing quality control,oil casing threading,API casing inspection
    Oil casing is a critical component of an oil or gas well,Installed inside the wellbore,it supports the well structure and provides a barrier that can be cemented in place to isolate formations,Its performance depends on material properties,dimensional accuracy,connection integrity and compliance with the applicable product specification,For drilling contractors,project engineers and procurement teams,understanding the oil casing manufacturing process helps clarify which production stages and inspection records matter when evaluating a supplier,
  • hollow section inspection,hollow section maintenance,hollow section corrosion,steel structure maintenance
    Steel hollow sections are widely used in buildings,industrial facilities,canopies and other structural applications,Once installed,their condition can change due to weather exposure,coating damage,impact,water accumulation or changes in service conditions,
  • hollow section supply for overseas construction projects,hollow section supplier,square hollow sections,rectangular hollow sections,hollow section export
    International hollow section orders involve more than supplying square or rectangular steel tubes,For overseas construction projects,buyers also need to consider specification compliance,supply coordination,inspection,export documentation,packing and delivery schedules,
  • hollow section service life,hollow section maintenance,hollow section durability,hollow section corrosion control,steel structure
    The service life of square and rectangular hollow section steel structures depends on more than the original steel grade,Environmental exposure,corrosion protection,fabrication quality,loading conditions,and maintenance all influence long-term performance,For building owners,project engineers and maintenance teams,extending service life starts with understanding how these factors interact,Addressing deterioration early can help reduce repair costs,avoid unnecessary downtime and maintain the intended performance of the structure,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.