Company News

Hunan Great Steel Pipe Co., Ltd
SSAW steel pipe supplier,galvanized pipe,spiral welded steel pipe

Measures to reduce the sticking phenomenon of steel pipe billet rolling

Date: 2020-03-25
Measures to reduce the sticking phenomenon of steel pipe billet rolling Measures to reduce the sticking phenomenon of steel pipe billet rolling When the billet is rolled, sometimes the safety mortar breaks and the stick stick phenomenon occurs, which leads to the shutdown accident and seriously affects the smooth production. The analysis considers the following reasons: 1. Capillary size factor. The large capillary tube size increases the continuous rolling load and increases the rolling force, which leads to broken rods. 2. Over-pressure factor of roll gap. The over-pressure of the roll gap increases the rolling reduction, which leads to an increase in rolling force, which greatly increases the probability of broken rods. 3. Large difference between the inside and outside of the roll gap. The difference between the inside and outside of the roll gap is large, the rolling force on the side with the large roll gap is small, and the rolling force on the side with the small roll gap is large. in In the case of a set rolling reduction, the side where the rolling force is too large tends to break. 4. Improper adjustment of roll speed. Improper adjustment of the rotation speed of the adjacent frame rolls will cause stacking and pulling steel. Pulling steel will reduce the rolling force, stacking steel will increase the rolling force, and the rolling force will increase the probability of breaking the rod. The improved method for this is: 1. Capillary sampling. When the specifications of the core rod change ≥ 5mm, capillary sampling must be proposed, and adjustment must be made according to the actual size of the capillary. When the core rod specification changes <5mm, the outer diameter of the capillary must be measured before the rod removal chain, and adjusted according to the outer diameter of the capillary. 2. Measure roll gap in time. After multiple adjustments, due to the cumulative adjustment error, the roll production between the roll gap and the actual roll gap may be too large, resulting in a high rolling force. For this reason, the actual roll gap must be measured once during the handover. The actual roll gap must be measured. 3. Measure the inner and outer roll gap in time. Due to the assembly accuracy of the roll itself, the gap between the inner and outer roll gaps of the continuous roll is often too large. Therefore, use the lead block to measure the inner and outer roll gaps of the rolls in time. If the inner and outer roll gaps are too poor, replace the rolls immediately 4.Standard speed adjustment. It is required that the difference in the speed correction value between adjacent frames should not be greater than 3%, to avoid over-stacking and pulling, which will cause the broken mortar and stick to stop. Post time: Mar-25-2020

Latest news list

  • coated steel pipe maintenance,coated steel pipe inspection,steel pipe coating repair,steel pipe corrosion protection
    Installing coated steel pipe does not end the corrosion-protection process,Once the pipe is connected to a pipeline,water system,industrial facility,or structural assembly,its coating must continue to protect the steel under actual service conditions,
  • coated steel pipe,steel pipe coating,FBE coated steel pipe,3LPE coated steel pipe,3LPP coated steel pipe
    Selecting the right coating for steel pipe is not simply a matter of choosing the thickest or most expensive material,In practice,coating selection means choosing a complete protection system that matches the pipe's service environment,operating temperature,installation conditions,corrosion risk,and applicable project specification,
  • coated steel pipe,coated steel pipe applications,coated steel pipe benefits,coated carbon steel pipe
    Industrial piping is often exposed to conditions that can accelerate corrosion,including moisture,soil,chemicals,salts,and outdoor environments,For many projects,using bare carbon steel without additional protection can increase maintenance requirements and shorten the expected service life of the piping system,
  • coated steel pipe procurement,how to buy coated steel pipe,coated steel pipe inspection,coated steel pipe
    Buying coated steel pipe is not simply a matter of comparing prices and selecting a pipe diameter,For an engineering project,the steel pipe,coating system,service environment,inspection requirements,and delivery conditions must all work together,A coating that is suitable for one pipeline may not be appropriate for another,Similarly,a technically compliant pipe can still create problems if the coating is poorly applied,damaged during transportation,or supplied without adequate inspection records,For procurement teams,checking the following points before placing an order can help reduce technical risk and avoid unexpected costs,
  • API 5L X52 seamless pipe,3LPE coated steel pipe,coated carbon steel pipe,API 5L steel pipe
    Reliable pipeline construction depends on more than simply supplying steel pipe,Material grade,pipe dimensions,manufacturing process,corrosion protection,inspection,and delivery coordination all need to match the project requirements,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.