Industry News

Hunan Great Steel Pipe Co., Ltd
A213 alloy steel pipe,dsaw steel pipe,A335 alloy steel pipe

voestalpine’s new special steel plant begins testing

Date: 2022-07-12
voestalpine’s new special steel plant begins testing Four years after its groundbreaking ceremony, the special steel plant at voestalpine’s site in Kapfenberg, Austria, is now complete. The facility – intended to annually produce 205,000 tons of special steel, some of which will be metal powder for AM – is said to represent a technical milestone for the voestalpine Group’s High Performance Metals Division in terms of digitalisation and sustainability. The plant replaces the existing voestalpine Böhler Edelstahl GmbH & Co KG plant in Kapfenberg, and is in addition to its traditional steel products, will produce metal powders for Additive Manufacturing. The first facilities are already undergoing testing. The project progressed throughout the COVID-19 pandemic, although delays in the delivery of key equipment led to project completion being pushed back by over a year. At the same time, voestalpine calculates that due to the difficult framework conditions, costs are expected to rise by around 10% to 20% over the initial planned investment of €350 million. “As the plant starts operating in fall 2022, initially with intermittent parallel operations using the existing electric steel mill, we can supply our customers with even better material qualities to further expand our global market leadership in tool and special steels,” stated Franz Rotter, member of the Management Board of voestalpine AG and Head of the High Performance Metals Division. “Our heartfelt thanks go to our dedicated employees at the site whose flexibility and extensive expertise will make this successful start-up possible.” “The new special steel plant will set new global benchmarks in sustainability and energy efficiency,” added Rotter. “This makes this investment an integral part of our overall sustainability strategy.” Post time: Jul-12-2022

Latest news list

  • how to choose a steel tee,steel tee selection,steel tee buying guide,equal tee vs reducing tee,steel tee procurement
    Selecting a steel tee for an industrial piping project involves more than matching pipe sizes,The fitting must meet the piping layout,material specification,connection requirements and operating conditions,An incorrect specification can lead to installation delays,additional inspection or costly changes after procurement,For project buyers and engineers,the best starting point is a complete technical inquiry that defines what the piping system requires,
  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.