Company News

Hunan Great Steel Pipe Co., Ltd
alloy steel pipe,plastic coated steel pipe,well tubing

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-04-02

Date: 2020-04-02
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Apr-02-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 676 669 676 663 668 663 668 668 Thickness 9.53 669 656 663 644 649 644 649 649 壁厚 (mm) 10 637 624 631 644 649 644 649 649 12 637 624 631 644 649 644 649 649 14 637 624 631 644 649 644 649 649 16 637 637 644 631 636 631 636 636 18 637 637 644 631 636 631 636 636 20 / / 644 631 636 631 636 636 22 / / 644 631 636 631 636 636 24 / / 644 631 636 631 636 636 26 / / / 644 636 631 636 636 28 / / / / 636 631 636 636 30 / / / / 636 631 636 636 32 / / / / 649 644 649 649 34 / / / / / / 649 649 36 / / / / / / 649 649 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 668 668 674 674 / / / / Thickness 9.53 668 668 668 668 668 713 700 / 壁厚 (mm) 10 649 649 655 655 655 726 726 / 12 649 649 642 642 642 674 726 / 14 649 649 642 642 642 674 726 / 16 636 655 642 642 642 674 719 / 18 636 655 642 642 642 674 719 / 20 636 655 642 642 642 674 719 / 22 636 655 642 642 642 674 719 / 24 636 655 642 642 642 674 719 / 26 636 655 642 642 642 674 719 / 28 623 642 629 629 629 674 719 / 30 623 642 655 655 655 674 719 / 32 636 655 655 655 655 687 726 / 34 636 655 661 661 661 687 726 / 36 636 655 661 661 661 687 726 / 38 636 655 661 661 661 687 726 / 40 / / / / / 687 726 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@hnssd.com; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during April 1st-7th; 4. The above price is only valide during April 1st-7th; 4. The above price is only valide during April 1st-7th; 4. The above price is only valide during April 1st-7th; 4. The above price is only valide during April 1st-7th; 4. The above price is only valide during April 1st-7th; 4. The above price is only valide during April 1st-7th; 4. The above price is only valide during April 1st-7th; 4. The above price is only valide during April 1st-7th; 4. The above price is only valide during April 1st-7th; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.