Price List

Hunan Great Steel Pipe Co., Ltd
erw black pipe,steel tube manufacturer,casing and tubing

API 5L GR.BASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) 2020-04-02

Date: 2020-04-02
API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) Post time: Apr-02-2020 API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) Outside Diameter Wall Thickness FOB TIANJIN FOB TIANJIN Outside Diameter Wall Thickness FOB TIANJIN FOB TIANJIN 外径 (mm) 壁厚 (mm) (Q235B)离港价 USD/TON (Q345B)离港价 USD/TON 外径 (mm) 壁厚 (mm) (Q235B)离港价 USD/TON (Q345B)离港价 USD/TON 245, 273 5.0-9.28 566.98 611.63 450, 457, 508, 530 6.5-11.98 588.68 662.11 245, 273 9.45-9.98 569.61 614.25 450, 457, 508, 530 12.0-14.5 595.12 668.55 245, 273 10.0-11.78 572.23 616.88 450, 457, 508, 530 15.0-17.8 601.56 674.99 299 5.0-9.28 566.98 611.63 450, 457, 508, 530 18.0-20.0 620.89 694.32 299 9.45-9.98 569.61 614.25 560, 610, 630 6.5-11.98 601.56 681.43 299 10.0-11.78 572.23 616.88 560, 610, 630 12.0-14.5 608.00 687.87 325 5.5-9.28 572.23 622.13 560, 610, 630 15.0-17.8 614.44 694.32 325 9.48-10.48 574.86 624.76 560, 610, 630 18.0-20.0 633.77 713.64 325 10.58-11.78 577.49 627.38 660 7.5-11.98 646.65 720.08 351, 355, 377 5.5-11.98 582.74 632.63 660 12.0-14.5 659.53 732.96 351, 355, 377 12.0-15 589.30 652.33 660 15 672.42 745.85 351, 355, 377 15.5-16 595.87 658.89 720, 820 8.5 659.53 732.96 402, 406, 426 5.5-11.98 586.68 648.39 720, 820 12.0-14.5 665.97 739.40 402, 406, 426 12.0-14.5 593.24 654.95 720, 820 15.0-19.98 672.42 745.85 402, 406, 426 15.5-16 599.81 661.52 720, 820 18.0-20.0 685.30 758.73 340 6.48-11.98 584.81 640.21 340 12.0-14.5 591.26 659.53 340 15.5-16 617.02 685.30 Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 1. The above price is based on BARE pipe, for extra coating, please contact sales@hnssd.com; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 2. The above price is based on FOB TIANJIN; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valid during April 1st-7th; 4. The above price is only valid during April 1st-7th; 4. The above price is only valid during April 1st-7th; 4. The above price is only valid during April 1st-7th; 4. The above price is only valid during April 1st-7th; 4. The above price is only valid during April 1st-7th; 4. The above price is only valid during April 1st-7th; 4. The above price is only valid during April 1st-7th; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing export,oil casing shipment,oil casing inspection,oilfield project procurement,oil casing delivery
    Supplying oil casing for an overseas drilling project involves more than arranging shipment,Product specifications,connection requirements,inspection records,packing and delivery schedules must align with the purchase order and project requirements,
  • oil casing service life,oil casing integrity management,oil casing corrosion,oil casing wear,oil casing maintenance
    Oil casing must withstand mechanical loads,pressure changes,temperature variations and potentially corrosive well fluids throughout its service life,Its long-term performance depends not only on the casing grade selected at procurement,but also on well design,operating conditions and integrity management,
  • oil casing grades comparison,J55 casing,K55 casing,N80 casing,P110 casing,casing grade selection
    Choosing the right oil casing grade affects load capacity,specification compliance and procurement cost,J55,K55,N80 and P110 are commonly specified under API 5CT,but they are not interchangeable simply because their dimensions are similar,The correct choice depends on the approved casing design,required mechanical properties,connection performance and service conditions,
  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.