Industry News

Hunan Great Steel Pipe Co., Ltd
api tubing,carbon steel pipe,A335 alloy steel pipe

API 5L GR.BASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE 2020-09-09

Date: 2020-09-09
API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE Post time: Sep-09-2020 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 670 674 681 694 694 694 694 694 Thickness 9.53 670 674 681 694 694 694 694 694 壁厚 (mm) 10 670 677 681 694 694 694 694 694 12 687 690 681 694 694 694 694 694 14 687 690 681 694 694 694 694 694 16 687 696 694 681 681 681 681 681 18 / 696 694 681 681 681 681 681 20 / / 694 681 681 681 681 681 22 / / 694 681 681 681 681 681 24 / / 694 681 681 681 681 681 26 / / / 694 681 681 681 681 28 / / / / 681 681 681 681 30 / / / / 681 681 681 681 32 / / / / 694 694 694 694 34 / / / / / / 694 694 36 / / / / / / 694 694 38 / / / / / / / / 40 / / / / / / / / FOB TIANJIN FOB TIANJIN Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 700 707 711 713 / / / / Thickness 9.53 700 707 711 713 724 724 730 / 壁厚 (mm) 10 700 707 711 713 724 724 730 / 12 707 720 724 726 737 737 743 / 14 707 720 724 726 737 737 743 / 16 707 720 724 726 737 737 743 / 18 707 720 724 726 737 737 743 / 20 707 720 724 726 737 737 743 / 22 713 733 737 739 746 746 752 / 24 713 733 737 739 746 746 752 / 26 713 733 737 739 746 746 752 / 28 720 746 746 752 752 752 759 / 30 720 746 746 752 752 752 759 / 32 720 746 746 752 752 752 759 / 34 726 746 746 752 752 752 759 / 36 726 746 746 752 752 752 759 / 38 726 746 746 752 752 752 759 / 40 / / / / / 752 759 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 1. The above price is based on BARE pipe; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 3. The above price is NOT including any packing and end processing charge, for detailed quotation; 4. The above price is only valide during September 9th–September 16th; 4. The above price is only valide during September 9th–September 16th; 4. The above price is only valide during September 9th–September 16th; 4. The above price is only valide during September 9th–September 16th; 4. The above price is only valide during September 9th–September 16th; 4. The above price is only valide during September 9th–September 16th; 4. The above price is only valide during September 9th–September 16th; 4. The above price is only valide during September 9th–September 16th; 4. The above price is only valide during September 9th–September 16th; 4. The above price is only valide during September 9th–September 16th; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.