API 5L GR.BASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE) 2020-09-09
Date: 2020-09-09
API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE)
Post time: Sep-09-2020
API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE)
API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE)
API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE)
API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE)
API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE)
API 5L GR.B/ASTM A53 GR.B (HOT EXPANDED ERW STEEL PIPE)
Outside Diameter
Wall Thickness
FOB TIANJIN
Outside Diameter
Wall Thickness
FOB TIANJIN
外径 (mm)
壁厚 (mm)
离港价 USD/TON
外径 (mm)
壁厚 (mm)
离港价 USD/TON
245, 273
5.0-9.28
582.95
450, 457, 508, 530
6.5-11.98
614.55
245, 273
9.45-9.98
585.47
450, 457, 508, 530
12.0-14.5
620.87
245, 273
10.0-11.78
588.00
450, 457, 508, 530
15.0-17.8
627.19
299
5.0-9.28
582.95
450, 457, 508, 530
18.0-20.0
646.16
299
9.45-9.98
585.47
560, 610, 630
6.5-11.98
627.19
299
10.0-11.78
588.00
560, 610, 630
12.0-14.5
633.51
325
5.5-9.28
588.00
560, 610, 630
15.0-17.8
639.84
325
9.48-10.48
590.53
560, 610, 630
18.0-20.0
658.80
325
10.58-11.78
593.06
660
7.5-11.98
671.44
351, 355, 377
5.5-11.98
598.12
660
12.0-14.5
684.08
351, 355, 377
12.0-15
604.44
660
15
696.73
351, 355, 377
15.5-16
610.76
720, 820
8.5
684.08
402, 406, 426
5.5-11.98
601.91
720, 820
12.0-14.5
690.40
402, 406, 426
12.0-14.5
608.23
720, 820
15.0-19.98
696.73
402, 406, 426
15.5-16
614.55
720, 820
18.0-20.0
709.37
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
1. The above price is based on BARE pipe;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
2. The above price is based on FOB TIANJIN;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
3. The above price is NOT including any packing and end processing charge;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
4. The above price is only valide during September 9th–September 16th;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;