API 5LASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE 2020-07-02
Date: 2020-07-02
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
Post time: Jul-02-2020
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
219
273
324
356
406
457
508
610
711
762
813
914
Wall Thickness
6
544
544
544
544
544
544
544
544
544
544
544
544
壁厚 (mm)
7
544
544
544
544
544
544
544
544
544
544
544
544
8
544
544
544
544
544
544
544
544
544
544
544
544
9
/
/
544
544
544
544
544
544
544
544
544
544
10
/
/
544
544
544
544
544
544
544
544
544
544
11
/
/
544
544
544
544
544
544
544
544
544
544
12
/
/
544
544
544
544
544
544
544
544
544
544
13
/
/
/
/
/
/
/
551
556
556
556
556
14
/
/
/
/
/
/
/
551
556
556
556
556
15
/
/
/
/
/
/
/
566
16
/
/
/
/
/
/
/
566
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
Outside Diameter 外径 (mm)
FOB TIANJIN
USD/TON
FOB TIANJIN
USD/TON
1016
1067
1118
1168
1219
1321
1422
1524
1626
1727
1829
1930
Wall Thickness
6
544
556
556
556
556
556
556
/
/
/
/
/
壁厚 (mm)
7
544
556
556
556
556
556
556
563
563
/
/
/
8
544
556
556
556
556
556
556
563
563
/
/
/
9
544
556
556
556
556
556
556
563
563
/
/
/
10
544
556
556
556
556
556
556
563
563
/
/
/
11
544
556
556
556
556
556
556
563
563
563
569
569
12
544
556
556
556
556
556
556
563
563
563
569
569
13
556
569
569
569
569
569
569
573
573
573
573
592
14
556
569
569
569
569
569
569
573
573
573
573
592
15
566
579
579
579
579
579
579
585
585
585
585
604
16
566
579
579
579
579
579
579
585
585
585
585
604
17
579
579
579
592
592
630
630
630
18
579
579
579
592
592
630
630
630
19
630
630
20
630
630
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
Note:
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
1. The above price is based on bare pipes, 12M fixed length;
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact us
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
3. The above price is not including any packing and end processing charge;
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
4. The above price is only valid during July 2nd – July 9th
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;
5. The applicapable MOQ for this price list is over 25 tons;