Product News

Hunan Great Steel Pipe Co., Ltd
coated carbon pipe,ssaw steel pipe,ERW steel pipe supplier

About 3PE anti-corrosion steel pipe coating peeling method

Date: 2022-10-13
About 3PE anti-corrosion steel pipe coating peeling method Mechanical peeling method of 3PE anti-corrosion coating At present, in the process of gas pipeline maintenance, the peeling method of 3PE anti-corrosion coating is proposed based on the analysis of the structure and coating process of 3PE anti-corrosion coating [3-4]. The basic idea of ​​peeling off the 3PE anti-corrosion coating of the steel pipe is to create external conditions (such as high temperature heating), destroy the adhesion of the composite structures of the 3PE anti-corrosion coating, and achieve the purpose of peeling the steel pipe. In the coating process of 3PE anti-corrosion coating, the steel pipe needs to be heated to above 200 ℃. However, if the temperature is too high, the following problems will occur: the curing reaction of the epoxy powder is too fast, the powder is not sufficiently melted, and the film formation is poor, which will reduce the bonding ability with the surface of the steel pipe; before the adhesive is coated, the epoxy resin functional group is excessively consumed. , partially or even completely lose the chemical bonding ability with the adhesive; the sintered epoxy powder layer may be slightly coked, manifested as darkening and yellowing, resulting in unqualified coating peeling inspection. Therefore, when the external temperature is higher than 200 ℃, the 3PE anti-corrosion coating is easier to peel off. After the gas pipeline is buried, the buried pipeline needs to be cut and modified due to the needs of municipal engineering; or when the gas leakage needs to be repaired, the anti-corrosion layer must be peeled off first, and then other pipeline operations can be carried out. At present, the stripping operation process of 3PE anti-corrosion coating of gas steel pipes is: construction preparation, pipeline pretreatment, heat treatment, stripping of 3PE anti-corrosion coating, and other construction work. ① Construction preparation Construction preparations mainly include: construction personnel and facilities in place, emergency repair of pipelines, depressurization treatment, operation pit excavation, etc. The construction equipment for peeling off the 3PE anti-corrosion coating mainly includes acetylene gas cutting gun, flat shovel or hand hammer. ② Pipeline pretreatment Pipeline pretreatment mainly includes: determining the pipe diameter, cleaning the outer surface of the pipe, etc. ③ Heat treatment Use an acetylene gas torch to heat the pretreated pipe at high temperature. The flame temperature of gas cutting can reach 3000 ℃, and the 3PE anti-corrosion coating applied on the gas pipeline can be melted at above 200 ℃. The adhesion of the coating is destroyed. ④ Peeling of 3PE anti-corrosion coating Since the adhesion of the heat-treated coating has been destroyed, a mechanical tool such as a flat spatula or a hand hammer can be used to peel the coating from the pipe. ⑤ Other construction work After peeling off the 3PE anti-corrosion coating, the cutting and modification of the pipeline, welding and the coating of the new anti-corrosion coating should be carried out. The currently used mechanical manual peeling method is slow and the peeling effect is average. Due to the limitations of construction equipment, the stripping work efficiency is not high, which directly affects the emergency repair efficiency of the gas pipeline. The limitations of construction equipment are mainly reflected in: a. The limitation of the spray flame area of ​​the gas cutting gun leads to a small area of ​​the coating melted by the gas cutting heating treatment; b. The limitation of the fit between tools such as flat shovels or hand hammers and the outer surface of the round pipe Lead to low coating peeling efficiency. Through the construction site statistics, the peeling time of the 3PE anti-corrosion coating under different pipe diameters and the size of the part to be peeled off was obtained. Post time: Oct-13-2022

Latest news list

  • honed tube,honed tube maintenance,honed tube service life,precision honed tube,honed tube warranty
    Honed tubes are critical components in hydraulic cylinders,where their inner surface quality directly affects piston movement,sealing performance,and equipment reliability,With precise bore tolerance,excellent straightness,and controlled surface roughness,honed tubes are widely used in construction machinery,industrial equipment,agricultural machinery,and automation systems,
  • precision honed tube,honed tube,honed steel tube,seamless honed tube,honed tube supplier,honed tube export
    Hunan Great Steel Pipe Co,,Ltd,recently completed the export of a batch of precision honed tubes for a hydraulic equipment manufacturer in Vietnam,The tubes will be used as hydraulic cylinder barrels for construction machinery,where dimensional accuracy and surface finish directly influence sealing performance,operating efficiency,and service life,
  • honed tube,precision honed tube,honed steel tube,DOM honed tube,seamless honed tube,honing process
    Hydraulic cylinder failures are often blamed on seals or hydraulic oil,but the condition of the cylinder bore is just as important,Even a small variation in bore accuracy can increase friction,shorten seal life,and reduce overall system efficiency,A honed tube is designed to solve these challenges,Through precision honing,the internal surface of the steel tube achieves strict dimensional accuracy and a controlled cross-hatch finish,allowing pistons and seals to operate smoothly under high pressure and repeated movement,With years of experience supplying hydraulic cylinder tubes and precision steel tubing for construction machinery,mining equipment,and industrial applications,Hunan Great Steel Pipe Co,,Ltd,provides customized honed tube solutions focused on dimensional accuracy,material reliability,and consistent quality,
  • honed tube,honed steel tube,precision honed tube,honed tubing,seamless honed tube,DOM honed tube
    Hydraulic cylinders are only as reliable as the tubes they are built from,Even a high-quality piston seal cannot perform properly if the cylinder bore has poor roundness,excessive roughness,or inconsistent dimensions,These seemingly small imperfections can lead to oil leakage,increased friction,and premature component wear,
  • Studded tube inspection,studded tube quality control,stud welding inspection,heat exchanger tube inspection
    A studded tube may appear to be a simple heat exchanger component,but its long-term performance depends on dozens of manufacturing details,Material traceability,stud welding quality,dimensional accuracy,and inspection records all influence whether the tube will operate reliably in high-temperature service,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.