Company News

Hunan Great Steel Pipe Co., Ltd
A335 alloy steel pipe,casing and tubing,rectangular galvanized steel pipe

Cladding process

Date: 2019-04-30
Cladding process Cladding process: laser cladding is supplied by way of cladding materials, which can be broadly divided into two categories, namely, pre-synchronized laser cladding and laser cladding. Laser cladding preset cladding material is placed on the substrate surface prior to cladding portion, and scanning the laser beam irradiation melts cladding material is added in the form of powder, wire, plate, powder form which is most commonly used. Synchronized laser cladding cladding material sucked directly into the laser beam, so that the feed and cladding simultaneously. Cladding material mainly in powder form is also fed, and some also used to synchronize the wire feed or plate. Laser Cladding preset main process is: the substrate surface pretreatment → preset cladding cladding materials →Preheat → laser melting → after heat treatment. The main synchronous laser cladding process is: the substrate surface pretreatment → send cladding material laser melting → after heat treatment. By the process, and laser cladding process is mainly related to the substrate surface pretreatment methods, feeding methods cladding materials, preheating and after heat treatment. Laser high power density, the laser processing system under NC control in designated parts of the surface of the substrate to form a thin layer of micro-melting, self-fluxing powder while adding certain ingredients, such as nickel, cobalt, and iron-based alloys, so that they are evenly spread in the molten state in the part surface and a predetermined thickness, a good metallurgical bond with the matrix metal micro-melting material, and only a small inter- dilution, in the subsequent rapid solidification process, part formed on the surface of the substrate is completely different, having a predetermined function of the special properties of the cladding layer of material, which can completely change the surface properties of the material, the surface can be obtained inexpensive high wear and corrosion resistance, high temperature properties. The process can repair holes and cracks in the surface of the material , you can restore worn parts geometry and performance. Post time: Aug-30-2019

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.