Industry News

Hunan Great Steel Pipe Co., Ltd
galvanized steel water pipes,LSAW steel pipe manufacturer,well tubing

Coiled Tubing Manufacturing Technology

Date: 2023-08-09
Coiled Tubing Manufacturing Technology Coiled tubing is a single length of several kilometers and repeated bending, achieve multiple plastic deformation of the new oil pipe. Coiled tubing equipment and its operation is called “universal working machine” in the foreign countries such as the United States, Canada and other countries, it has become the oilfield coiled tubing operations essential oil equipment. Currently the longest continuous tubing is 9000m long, with respect to such special tubing manufacturing core technology is: 1, The chemical elements Due to the harsh environment service, coiled tubing mechanical properties and corrosion resistance have high requirements, to optimize the design of the chemical composition of the material, it must also implement clean control the whole process of smelting, rolling, etc., to minimize inclusions and S, P and other harmful elements. 2, Processing Since dislocation multiplication after other causes hardening and Bauschinger effect together, transform law tubular body strength to control. 3, Heat treatment By tube heat treatment to achieve optimum control of microstructure and properties, especially high strength and high ductility and low residual stress. 4, Welding Technology Low carbon and low alloy steel, currently used mainly HFW welding technology, need to study the optimum welding parameters (such as current, voltage, frequency, welding speed, forming angle, the pressing amount, etc.), research and seam weld heat treatment technology. 5, Butt To achieve continuous production HFW pipe, it must first take a long sheet, the current sheet docking mainly TIG, MAG and plasma welding or the like. The method under study is friction stir welding method. 6, Pipe butt Coiled tubing during use may cause local damage, injury or defect part must be cut away, and the tubes are connected by welding. The traditional method of docking ships by hand TIG welding, the welding quality is difficult to control, so that the current automatic welding technology. 7, New manufacturing technologies As CVR technology, which uses continuous pipe of the same size tube and heated to 940 ℃ through online medium frequency induction by thermomechanical rolling, on the one hand to achieve seamless or HFW weld optimization, on the other hand to achieve variable wall thickness or adjustable. In addition, there are special stainless steel tube continuous laser welding technology. Post time: Aug-09-2023

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.