Large-caliber Straight Seam Steel Pipe Production Process 1. Before molding work Raw materials that strip, wire, flux. We must go through rigorous physical and chemical testing before it is put. Strip head and tail docking, single or double wire submerged arc welding, in rolled steel by automatic submerged arc welding. 2. The molding process Electric contact pressure gauge to control both sides of the conveyor pressure cylinder pressure to ensure the smooth delivery of the strip, the host is centrally located, so you should always check to adjust the vertical roll (especially around the head), to ensure delivery of the strip edges strict according to the process specified route runs through the meshing point design. By external or internal control roll forming, checking the perimeter, pipe ovality, straightness and other compliance standards, do not meet the requirements, will have to continue to make adjustments until the desired date. 3. The welding process The weld gap control device to ensure the weld gap to meet the welding requirements, diameter, the wrong side and the weld gap have been strictly controlled, should continuously observe the quality of the molding seam, found the wrong side, slotted, etc. should be after the bridge in time to fine-tune the angle, forming quality assurance; when exceptional circumstances should check the working width of the strip, the edge pre-bending condition, the delivery line position, with or without small change in roll angle, and to take timely corrective action. Hebei straight seam welded steel pipe manufacturers currently inner and outer welding are used by the US Lincoln welding machine for single or double wire submerged arc welding, thereby obtaining a stable welding quality. Straight seam steel pipe manufacturers should continuously observe the quality of the molding seam, found the wrong side, slotted, etc. should be fine-tuning the angle of the rear axle, to ensure the quality of the molding; when exceptional circumstances should check the working width of the strip, the edge pre-bending status, delivery line position, small roll angle without changes, and to take timely corrective action. 4. Detection After welding the weld line continuous ultrasonic injury checks to ensure 100% coverage of non-destructive testing of spiral weld. If defective, automatic alarm and spraying tags, production workers so adjusting the process parameters, and remove defects. 5. Packaging library Pipe end machining, so that the end vertical, bevel and blunt edge be accurately controlled. Using air plasma cutting machine will cut a single tube. Blade with a blunt or damaged, it should be immediately replaced with new blades and new blade before use stone must be polished blade tip can not use grinders grinding. After application whetstone grinder grinding again before use after grinding blade defect. Post time: Aug-08-2023

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,