Company News

Hunan Great Steel Pipe Co., Ltd
coated carbon pipe,galvanized pipe,api tubing pipe

Erw pipe manufacturing process

Date: 2019-12-30
Erw pipe manufacturing process Erw pipe process mianly depends on a variety of products from raw materials to finished products, which need to go through a series of processes, completion of these processes requires a variety of machinery and equipment and welding, electrical controls, detection devices, these devices and devices according to different. The process requires a variety of reasonable arrangement, the typical flow of high frequency welded pipe: open-book – strip leveler – head and tail cut – strip butt – looper accumulator – molding – welding – clear the glitch – sizing – flaw -fly cut – Initial verification – tube Straightening – pipe processing – hydrostatic testing – flaw detection – Printing and coating – finished. High-frequency welding is continuously flowing through the workpiece contact surface of the high-frequency current generated by the resistance heating and forging force to impose, so that the workpiece metal to achieve a mutually successive welding method. It is similar to the ordinary resistance welding, but there are many important differences. High-frequency welding for carbon steel welded pipe production has been 40 years of history. High-frequency welding power power of different material, diameter and wall thickness of steel pipe to achieve a higher welding speed (more than l0 times higher than the the TIG highest welding speed). Therefore, production of general-purpose high-frequency welding steel pipe has a higher productivity of high-speed high-frequency welding, pipe within the burr removal difficult, and this is also the high-frequency welded steel pipe is not yet for the chemical, nuclear industry accepted one of the reasons. From the welding material, high frequency welding can weld all types of steel pipes. At the same time, the development of new steel grades and shaping the progress of welding methods. Post time: Dec-30-2019

Latest news list

  • honed tube,precision honed tube,honed steel tube,DOM honed tube,seamless honed tube,honing process
    Hydraulic cylinder failures are often blamed on seals or hydraulic oil,but the condition of the cylinder bore is just as important,Even a small variation in bore accuracy can increase friction,shorten seal life,and reduce overall system efficiency,A honed tube is designed to solve these challenges,Through precision honing,the internal surface of the steel tube achieves strict dimensional accuracy and a controlled cross-hatch finish,allowing pistons and seals to operate smoothly under high pressure and repeated movement,With years of experience supplying hydraulic cylinder tubes and precision steel tubing for construction machinery,mining equipment,and industrial applications,Hunan Great Steel Pipe Co,,Ltd,provides customized honed tube solutions focused on dimensional accuracy,material reliability,and consistent quality,
  • honed tube,honed steel tube,precision honed tube,honed tubing,seamless honed tube,DOM honed tube
    Hydraulic cylinders are only as reliable as the tubes they are built from,Even a high-quality piston seal cannot perform properly if the cylinder bore has poor roundness,excessive roughness,or inconsistent dimensions,These seemingly small imperfections can lead to oil leakage,increased friction,and premature component wear,
  • Studded tube inspection,studded tube quality control,stud welding inspection,heat exchanger tube inspection
    A studded tube may appear to be a simple heat exchanger component,but its long-term performance depends on dozens of manufacturing details,Material traceability,stud welding quality,dimensional accuracy,and inspection records all influence whether the tube will operate reliably in high-temperature service,
  • studded tube,studded tube heat exchanger,heat exchanger tube,studded tube applications,waste heat recovery tube
    In gas-side heat exchangers,the greatest challenge is often not the tube material itself but the relatively low heat transfer coefficient of hot gases,Engineers must improve thermal efficiency without compromising mechanical strength or increasing maintenance requirements,
  • shipment news,project order,export supply,reliable manufacturer,heat exchanger steel tube,studded tube
    We recently completed the shipment of a customized order of heat exchanger steel tubes and studded tubes for an overseas industrial project,Manufactured according to the customer's technical specifications,the products underwent comprehensive quality inspections before export to support reliable installation and long-term operation,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.