Company News

Hunan Great Steel Pipe Co., Ltd
spiral submerged arc pipe,spiral welded steel pipe,lsaw steel pipe

Heat treatment technology of oil casing

Date: 2021-06-03
Heat treatment technology of oil casing After the oil casing adopts this heat treatment method, it can effectively improve the impact toughness, tensile strength, and anti-destructive performance of the oil casing, ensuring good value in use. Petroleum casing is a necessary pipe material for drilling oil and natural gas, and it needs to have good performance in use. Different temperature control is selected for different temperature sections of oil casing. Heating needs to be produced according to a certain temperature. For 27MnCrV steel, AC1=736℃, AC3=810℃, the tempering temperature should be 630℃ after quenching, and tempering heating The holding time is 50 minutes; the heating temperature is selected from 740 to 810°C during sub-temperature quenching. The heating temperature of sub-temperature quenching is 780℃, and the holding time of quenching heating is 15 minutes. Because sub-temperature quenching is heated in the α+γ two-phase zone, quenching is performed in the state of local undissolved ferrite, maintaining high strength while achieving toughness. improve. The heat treatment of oil casing must be strictly performed to ensure that the produced oil casing has excellent product quality and performance, and only when it is used can it show good use value and performance, adhere to high strength and toughness, and heat treatment in different ways. At the same time, the low-temperature quenching temperature is lower than the conventional temperature, which reduces the quenching stress and reduces the quenching deformation. This ensures the smooth operation of the production of oil casing heat treatment and provides good conditions for subsequent wire processing. raw material. At present, the process has been applied in different steel pipe processing plants. The quality assurance data shows that the tensile strength of the heat-treated steel pipe is Rm910-940MPa, the yield strength Rt0.6820-860MPa is 100% qualified, and the impact toughness Akv65-85J data indicates that The 27MnCrV steel pipe is already a very high-quality high-steel grade petroleum casing. On the other hand, it also shows that the sub-temperature quenching process is an excellent method to avoid high-temperature brittleness in the production of steel products. Post time: Jun-03-2021

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.