Petroleum casing threaded connection type insulation joint installation requirements

Date: 2021-06-04
Petroleum casing threaded connection type insulation joint installation requirements 1. Within 50 meters of the installation location of the insulation joint, avoid dead holes to be welded. 2. After the insulated joint is connected to the pipeline, it is not allowed to lift the pipeline within 5 meters of the joint. The pressure must be tested together with the pipeline. 3. After the insulation joint is connected to the pipeline, the joint should be repaired as required, and the surface temperature of the insulation joint is not allowed to be higher than 120 ℃ during anti-corrosion operation. 4. When installing the insulating joint, it should be installed at the two ends of the joint on the straight pipe section 20 meters away from the elbow and set up the bracket. Underground installation should be avoided in the perennial water. 5. The center axis distance of the joint should be installed on the same straight line as the center axis distance of the pipeline, and the two center axis distances should not be greater than 0.2mm during installation. 6 When the pipeline displacement ≥ the compensation amount of the insulation joint, the number of joints should be increased to parallel the displacement. It is strictly forbidden to adjust the excess tolerance of the pipeline so that the insulation joint is in a state of limit disturbance displacement and deviation, let alone exceeding the limit ( Expansion, displacement, deflection, etc.). 7 When the insulating joint is in a high-rise or suspended in the air, the pipeline should be fixed on the hanger, bracket, or anchor frame. The insulating joint should not allow the joint to bear the weight and axial force of the pipeline itself, otherwise the joint should be equipped with an anti-pull-off device (its bearing capacity). Must be greater than the axial force of the pipe). Post time: Jun-04-2021

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.