Product News

Hunan Great Steel Pipe Co., Ltd
smls pipe,stainless steel pipe,electric resistance welded

How to connect the refrigeration pipes

Date: 2021-10-12
How to connect the refrigeration pipes Cooling pipe using seamless steel tube should be used as welding, in addition to use when connected to the equipment, valves flanged or threaded connection. gas welding using diameter less than 5omm, diameter greater than 5omm using welding. Pipe welding is commonly used in refrigerator, only when necessary in terms of installation and maintenance, flanged or threaded connection is used. Using convex surface flat welding flange square flange or kidney-shaped flange, when flange connection, gaskets with a thickness of 1 ~ 3mm oil rubber asbestos, and modulation of graphite coated with oil. When threaded connection, you should use gasoline or kerosene to clean the oil on the threads, and then coated with glycerol to reconcile gluten feed or Teflon tape as a seal packing, prohibited the use of lead as flax oil and seal packing. Freon refrigeration pipe diameter is less than 25 mm with copper pipe, there are several connection methods. (1) the finished copper pieces. the interface form for the socket type, brazing connection. (2) socket connected by copper brazing, the annealing should first pipe end, and then heating the mold with the socket, the socket diameter should be larger than the outer diameter of the insertion tube 0.25 ~ 0.5mm, the socket valid depth can be equal to the pipe diameter, mounting direction Looking medium flow. (3) flange connection. According to the design requirements and the specific circumstances, pipeline installation works can be used for copper and copper alloy pipe flange loose flange, welding ring loose flange and welded flange, welded flange connection form. Post time: Oct-12-2021

Latest news list

  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,
  • oil casing manufacturing,API casing production process,oil casing quality control,oil casing threading,API casing inspection
    Oil casing is a critical component of an oil or gas well,Installed inside the wellbore,it supports the well structure and provides a barrier that can be cemented in place to isolate formations,Its performance depends on material properties,dimensional accuracy,connection integrity and compliance with the applicable product specification,For drilling contractors,project engineers and procurement teams,understanding the oil casing manufacturing process helps clarify which production stages and inspection records matter when evaluating a supplier,
  • hollow section inspection,hollow section maintenance,hollow section corrosion,steel structure maintenance
    Steel hollow sections are widely used in buildings,industrial facilities,canopies and other structural applications,Once installed,their condition can change due to weather exposure,coating damage,impact,water accumulation or changes in service conditions,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.