Price List

Hunan Great Steel Pipe Co., Ltd
carbon steel pipe provider,plastic coated steel pipe,carbon steel pipe supplier

How to solve the deformation problem of spiral seam submerged arc welded steel pipe

Date: 2021-07-14
How to solve the deformation problem of spiral seam submerged arc welded steel pipe The spiral seam submerged arc welded steel pipe is drilled in rotation and begins to enter the soft formation. Under the action of the tri-cone, the drill first produces elastic shear deformation of the stratum and then is removed under the pressure of the tri-cone. In the simulated environment, the soft soil is homogeneous clay, regardless of the stratum and the cracks in the soil. Horizontal directional drilling is carried out in an abrupt formation, and the formation is in random and dynamic contact with the roller cone bit. Friction occurs when the cone is in contact with the ground. The impact force causes the spiral seam submerged arc welded steel pipe to vibrate. When the tri-cone bit moves from the soft formation to the hard formation, it will inevitably produce large lateral vibration and up and down the vibration. When the drilling speed is 0.008m/s and the bit rotation speed is 2 radians/s, the pseudo-strain energy curve during the advancing process of the roller cone bit mainly includes viscosity and elasticity. However, since the viscous term usually dominates, the transformation of most of the energy into pseudo strain energy is irreversible. The deformation energy of spiral seam submerged arc welded steel pipe is the main energy consumed to control the deformation of the hourglass. If the pseudo strain energy is too high, it means that the strain energy controlling the deformation of the hourglass is too large, and the mesh should be refined or modified. To reduce excessive pseudo strain energy. The sudden change of pseudo strain energy in this model mainly occurs when the drill bit enters the soft soil layer and the cone bit passes through the interface of the sudden change formation. The greater the hardness of the formation, the greater the pseudo strain energy of the drill bit into the formation. Simulate the drilling process of spiral welded pipe in the abrupt formation and predict the change of the drill bit’s drilling trajectory. (1) The sudden change of pseudo-strain energy mainly occurs when the drill bit enters the soft soil layer and the cone bit crosses the interface of the sudden change formation. The higher the forming hardness, the greater the pseudo strain energy of the spiral seam submerged arc welded steel pipe when it enters the forming process. (2) When drilling into the formation suddenly, the spiral seam submerged arc welded steel pipe moves longitudinally and the drill bit vibrates. The greater the hardness of the formation, the greater the amplitude of the drill bit. (3) Under the condition of a certain stratum dip, the greater the drilling speed of the drill bit, the greater the longitudinal deviation of the drilling trajectory, and the greater the drill bit speed, the smaller the longitudinal deviation of the drilling trajectory. When the bit rotation speed is lower than 2.2rad/s, the influence of the rotation speed on the longitudinal deviation of the drilling trajectory is reduced. (4) At a certain bit rotation speed, when the local formation dip angle is 0° and 90°, it has no effect on the drilling trajectory; when the local dip angle gradually increases, the longitudinal deviation of the drilling trajectory increases; when the local dip angle exceeds 45°, The influence on the trajectory of drilling longitudinal deviation is reduced. The research results in this chapter are of great significance for improving the prediction accuracy of the tri-cone drill bit in steep formations and lay a theoretical foundation for the correction of the spiral seam submerged arc welded steel pipe drilling trajectory through the horizontal pilot hole. Post time: Jul-14-2021

Latest news list

  • stainless seamless steel pipe,high temperature stainless steel pipe,stainless steel pipe selection
    High-temperature piping requires more than simply selecting a stainless steel grade,As temperature increases,material strength,corrosion behavior,thermal expansion,pressure resistance,and long-term stability become increasingly important,For this reason,stainless seamless steel pipe should be selected against the complete service condition rather than temperature alone,
  • stainless seamless steel pipe,stainless seamless steel pipe manufacturing,stainless steel pipe quality control
    Stainless seamless steel pipe is used in chemical processing,oil and gas,power generation,water treatment,food processing,and other applications where material performance and pressure integrity matter,But a finished pipe does not become reliable simply because it is made from stainless steel,Its quality is built through material control,forming,heat treatment,dimensional control,inspection,and traceability,Understanding how stainless seamless steel pipe is manufactured gives engineers and technical buyers a better way to evaluate suppliers beyond price,surface appearance,or a product catalogue,
  • LSAW steel pipe maintenance,LSAW pipe maintenance,LSAW steel pipe inspection,LSAW pipeline maintenance
    Installing a properly specified LSAW steel pipe does not eliminate the need for pipeline maintenance,Once a pipeline enters service,corrosion,coating deterioration,mechanical loading,ground movement,operating changes,and environmental exposure can gradually affect its condition,For large-diameter pipelines,a practical maintenance program should focus on identifying changes early and taking corrective action before a manageable condition develops into an integrity problem,The objective is not simply to inspect the pipe,It is to understand the condition of the complete pipeline system and respond based on evidence,
  • LSAW steel pipe,LSAW steel pipe for high pressure,high-pressure pipeline,LSAW pipe wall thickness
    High-pressure pipeline systems place demanding requirements on pipe material,dimensions,weld integrity,inspection,and operating conditions,For large-diameter pipelines,LSAW steel pipe can be an effective solution because its manufacturing process allows large outside diameters and substantial wall thicknesses to be produced from steel plate,However,selecting LSAW steel pipe for pressure service is not simply a matter of choosing a thicker wall,The pipe specification needs to match the actual design pressure,temperature,fluid,diameter,applicable code,and service environment,
  • LSAW steel pipe corrosion,LSAW steel pipe coating,3PE coated LSAW steel pipe,FBE coated steel pipe
    LSAW steel pipe is widely used for large-diameter water transmission,buried pipelines,and other infrastructure projects where strength,dimensional control,and long-term service reliability are important,However,pipe strength alone does not prevent corrosion,For buried or water pipeline systems,corrosion protection should be considered from material selection and coating through transportation,field welding,installation,and long-term inspection,A coating system should also be selected according to the actual operating environment rather than simply by initial cost,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.