Company News

Hunan Great Steel Pipe Co., Ltd
stainless steel pipe,coated steel pipe,tubing pipe

Process technology of thermally expanded seamless steel pipe

Date: 2023-11-27
Process technology of thermally expanded seamless steel pipe Diameter expansion is a pressure processing technology that uses hydraulic or mechanical means to apply force from the inner wall of the steel pipe to expand the steel pipe radially outward. The mechanical method is simpler and more efficient than the hydraulic method. Several of the world’s most advanced large-diameter longitudinally welded pipelines have been used in the expansion process. The process is: The mechanical expansion utilizes the split sector block at the end of the expander to expand in the radial direction so that the tube blank is stepped along the length direction to realize the plastic deformation process of the entire tube length in sections. Divided into 5 stages 1. The preliminary rounding stage. The fan-shaped block is opened until all the fan-shaped blocks touch the inner wall of the steel pipe. At this time, the radius of each point in the inner tube of the steel pipe within the step length is almost the same, and the steel pipe is initially round. 2. Nominal diameter stage. The fan-shaped block starts to reduce the movement speed from the front position until it reaches the required position, which is the inner circumferential position of the finished pipe required by the quality. 3. Rebound compensation stage. The fan-shaped block will further slow down at the position of stage 2 until it reaches the required position, which is the position of the inner circumference of the steel pipe before rebound as required by the process design. 4. Pressure holding and stable stage. The sector block remains stationary for a while before rebounding on the inner circumference of the steel pipe. This is the pressure maintaining and stable stage required by the equipment and the diameter expansion process. 5. Unloading and returning stage. The sector block rapidly retracts from the position of the inner circumference of the steel pipe before the rebound, until it reaches the initial expansion position, which is the minimum contraction diameter of the sector block required by the diameter expansion process. In practical applications, in the process of simplification, the 2nd and 3rd steps can be combined and simplified, which does not affect the expansion quality of the steel pipe. Post time: Nov-27-2023

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.