Processing technology and coating method of EP inner and PE outer anti-corrosion steel pipe First, the processing technology of EP inner and PE outer anti-corrosion steel pipe: The EP inner and PE outer anti-corrosion combination process of large-diameter water pipeline is to combine the characteristics of thermosetting epoxy resin powder coating and polyethylene powder coating and the processing technology, and cleverly combine the single-layer polyethylene coating with the fused epoxy powder coating technology to provide good protection for the corrosion protection of buried steel pipes. After continuous research and improvement in the market, the EP coating inside the pipeline and the PE coating outside are a good anti-corrosion combination solution for steel pipe anti-corrosion. At present, it has become a widely used product for large-diameter water pipelines in the market. Second, the coating method of EP inner and PE outer anti-corrosion steel pipe: 1. There are five types of internal coating methods for EP inner and PE outer anti-corrosion steel pipes: well coating, non-static gun extension rod spraying, non-static powder pump push-pull rod spraying, buckle powder, and vacuum suction coating. 2. There are four types of external coating methods: well coating, electrostatic spraying, fluidized bed dipping, and waterfall coating. 3. There are two types of internal and external coating at the same time: well coating (internal and external coating) and fluidized bed dipping (external dipping, internal non-electrostatic powder pump push-pull rod spraying). Methods of well coating for anti-corrosion steel pipes with EP inside and PE outside: The well coating method (internal and external coating) for internal and external coating at the same time is the basic form introduced to China in the 1990s. Now most of them have been eliminated. Some are still used in some places, but they are basically used for the plastic coating of threading pipes, and the inside and outside are mostly PE powder. This form requires the use of fluidized wells, so deep wells need to be dug in the factory, generally exceeding the usual specifications of steel pipes by 6m, and 8.5m deep wells are dug. Fluidized plates or fluidized cloths are arranged 500 mm above the well. The fluidized cloths are generally arranged in 16 layers. A high tower is added to the side of the well, and a high-speed winch is configured below. The winch line speed reaches 120 meters/minute. For overweight steel pipes and large-size steel pipes DN500-DN800, the winch line speed is 90 meters/minute. The speed of the winch is too slow, the steel pipe is immersed in the fluidized well for too long, and the thickness difference of the coating on the upper and lower ends of the steel pipe is large. In this way, compressed air needs to be introduced under the fluidized plate or fluidized cloth to make the powder in the well form a fluidized state. When the EP-inner and PE-outer anti-corrosion steel pipe is immersed in the fluidized well, the lower end of the steel pipe coating is thick and the upper end is thin because the lower end of the steel pipe is first in and then out. The productivity is fast, and it takes about 10 seconds to coat a steel pipe. In actual production, when producing PE threading pipe coated steel pipe, the powder coating on the upper and lower ends of the steel pipe differs by 300 microns. Post time: Jul-11-2025

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,