Product News

Hunan Great Steel Pipe Co., Ltd
erw steel pipe,carbon steel pipe provider,plastic coated steel pipe

Quality control of structural steel pipe

Date: 2019-04-30
Quality control of structural steel pipe Structural steel in its wall thickness, good materials, processing technology and stability, becoming the first choice for large domestic and foreign oil and gas pipe project. In the large-straight seam welded steel pipe joint structure, weld and heat affected zone is the easiest place to produce a variety of defects, and weld undercut, pores, slag, lack of fusion, lack of penetration, weld, burn, weld cracking is the main form of welding defects, and are often the cause structural steel quality accidents origin. Structural steel quality control measures include: Prior to welding quality control 1. Make a good quality of raw materials, after passing inspection before being officially entered the construction site, and resolutely put an end to the use of substandard steel. 2, Followed by the management of welding materials. Check whether the welding materials for qualified products, storage and baking system if implemented, whether to issue a welding material surface clean and free of rust, electrode coating is intact, with or without mildew. 3, Welding area clean management. Clean quality inspection weld zone, without water, oil, rust and dirt oxide film, which is to prevent external weld defects produce important role. 4, Select the appropriate welding method should be implemented first test welding, after welding principles. Quality control in the welding process 1, According to welding procedure specifications wire and flux review is correct, prevent misuse wire and flux caused by welding quality accident. 2, The welding environment supervision, take appropriate measures after welding when welding environment is not good (temperature below 0 ℃, relative humidity greater than 90%) should be. 3, Before the expected first test weld groove dimensions, including space, blunt edge, the angle and the wrong mouth, etc. meets the process requirements. 4, Inside and outside the submerged arc welding process chosen welding current, welding voltage, welding speed and other parameters are correct. 5. Supervise staff in the submerged arc welding inside and outside the welding arc full advantage of steel tube end plate length, straight seam steel strengthen the efficiency of the welding arc when the inner and outer plates, which helps to improve the quality of welding the pipe ends. 6, Supervise welding personnel in the welding slag clean whether first, whether the joint has been completely processed, whether the groove of the oil, rust, slag, water, paint and other contaminants. Post time: Aug-30-2019

Latest news list

  • hollow section corrosion protection,square steel pipe corrosion,rectangular steel pipe corrosion,hollow section protection,steel hollow section maintenance
    Square and rectangular hollow sections are widely used in structural frames,equipment supports,industrial platforms and fabricated steel structures,Their closed profiles provide an efficient combination of strength,stiffness and clean geometry,but carbon steel hollow sections can corrode when they are exposed to moisture,salts,chemicals or other aggressive conditions,
  • hollow section manufacturing,square steel pipe,rectangular steel pipe,hollow section production,hollow section quality control
    Square and rectangular hollow sections are widely used in structural frames,industrial equipment,construction projects and fabricated steel structures,Their appearance is simple,but producing a section with consistent dimensions,wall thickness,straightness and material performance requires control at several stages,
  • alloy steel pipe buying guide,buy alloy steel pipe,alloy steel pipe supplier,alloy steel pipe export
    Buying alloy steel pipe for an international project involves more than comparing prices per tonne,For EPC contractors,distributors and industrial buyers,procurement needs to connect technical specifications,quality control,inspection,documentation and logistics,A well-defined purchasing process helps reduce specification gaps,inspection delays and delivery problems before the pipe reaches the project site,
  • how to select alloy steel pipe,alloy steel pipe selection,alloy steel pipe buying guide,high temperature alloy steel pipe
    Selecting alloy steel pipe should start with the actual service conditions,not simply with a supplier's product catalog,In boiler,power generation and refinery applications,temperature,pressure,process medium and material properties all affect pipe selection,For example,ASTM A335,A335M-26 covers seamless ferritic alloy-steel pipe for high-temperature service,The standard states that selection depends on design,service conditions,mechanical properties and high-temperature characteristics,For buyers,a structured selection process helps prevent specification gaps before production begins,
  • alloy steel pipe maintenance,alloy steel pipe boiler usage,alloy steel pipe refinery,high temperature pipe maintenance
    Alloy steel pipe is widely used in boiler,power generation and refinery systems where piping is exposed to elevated temperatures,pressure and demanding process conditions,Selecting the correct alloy grade is important,but material selection alone does not determine service life,Long-term performance also depends on operating conditions,thermal exposure,wall thickness,fabrication quality,inspection and maintenance,For example,ASTM A335,A335M-26 covers seamless ferritic alloy-steel pipe for high-temperature service and states that material selection depends on design,service conditions,mechanical properties and high-temperature characteristics,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.