Price List

Hunan Great Steel Pipe Co., Ltd
electric resistance welded pipe,stainless pipe,ERW steel pipe provider

Seamless steel tube straightening process

Date: 2022-11-08
Seamless steel tube straightening process 1. The seamless steel tube enters the roller table at the entrance of the leveler from the upstream roller table. 2. When the head of the seamless steel tube is sensed by the sensor element in the middle of the entrance roller table, the roller table will decelerate. 3. When the head of the seamless steel tube is sensed by the sensor element at the end of the entrance roller table, the first stage of the entrance roller table falls, and the closing delay of the inlet quick-opening cylinder starts to count. 4. When the pipe head enters the middle position of the inlet straightening roller, the inlet quick opening cylinder is closed, the seamless steel tube is bitten in, and at the same time the second roller table of the inlet falls. 5. Through the setting of the delay time of the quick-opening cylinder, when the pipe head enters the middle position of the intermediate roll and the exit roll, the quick-opening cylinders of the intermediate roll and the exit roll are closed successively, and the seamless steel tube enters the straightening process. 6. When the tube tail leaves the sensor element in the middle of the entrance roller, the first section of the entrance roller rises. 7. When the tube tail leaves the sensor element at the end of the inlet roller table, the second section of the inlet roller table rises. At the same time, through the setting of the quick-open cylinder delay, when the tube tail reaches the middle position of the inlet roller, the middle roller and the outlet roller, The quick-opening cylinders of the inlet roller, the middle roller and the outlet roller are opened successively. 8. The outlet roller table rises, and the seamless steel tube is transported to the baffle at the end of the outlet roller table. 9. The exit roller table is lowered, the side door of the channel is opened, and the seamless steel tube rolls onto the L-shaped splicing hook by gravity. 10. When the receiving hook falls, the seamless steel tube rolls onto the soot-blowing stand, and the iron oxide scale on the inner surface of the seamless steel tube is purged. Post time: Nov-08-2022

Latest news list

  • Steel Elbow erosion,Steel Elbow wear,piping erosion,Steel Elbow wall thickness inspection,abrasive flow,Steel Elbow inspection
    Steel Elbows redirect flow in industrial piping systems,but this change in direction can make them vulnerable to localized erosion,When fluids carry sand,scale,catalyst particles or other solids,repeated particle impacts may gradually reduce the Steel Elbow wall thickness,Corrosion can accelerate the damage when the fluid is also chemically aggressive,Reducing Steel Elbow erosion starts with identifying the wear mechanism,reviewing operating conditions and tracking wall-thickness changes,The right solution depends on the process,material,fitting geometry and piping design,
  • steel reducer manufacturing,steel reducer quality control,steel reducer inspection,concentric reducer,eccentric reducer,steel pipe fitting production
    A steel reducer connects pipes of different diameters while providing a controlled transition in a piping system,Its dimensions,material properties and wall-thickness distribution affect installation,flow conditions and service reliability,For project buyers,understanding steel reducer manufacturing and quality control helps ensure that the supplied fittings match the piping design and applicable specifications,
  • steel pipe fitting leakage prevention,steel tee leakage,steel reducer connection,steel elbow joint
    Leakage at steel pipe fitting connections can cause unplanned shutdowns,fluid loss,maintenance costs and safety risks,A steel tee,reducer or elbow may meet its dimensional requirements,yet the connection can still leak because of poor fit-up,joining defects,damaged sealing surfaces or excessive operating loads,Preventing leakage requires attention to the complete piping system,from component selection and installation to inspection and operation,The correct approach depends on whether the connection is welded,flanged or threaded,
  • steel tee manufacturing,steel tee inspection,steel tee manufacturing process,steel tee quality control,butt welding tee
    Steel tees are butt-welding pipe fittings used to connect branch lines to a main pipeline,They are commonly specified in oil and gas,petrochemical,power generation and other industrial piping systems,Their suitability depends on more than nominal size: material grade,branch geometry,wall thickness,manufacturing quality and inspection requirements must all match the project specification,For engineers and purchasing teams,understanding how steel tees are manufactured and inspected helps identify the information that should be confirmed before an order is placed,
  • oil casing storage and handling,casing thread protection,casing receiving inspection,oil casing transportation
    Oil casing needs proper protection from delivery through installation,Poor lifting practices,damaged thread protectors,unsuitable storage conditions or lost product identification can create problems before casing reaches the well,For drilling contractors,site managers and procurement teams,careful receiving,storage and handling help preserve product condition and prevent avoidable delays,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.