Product News

Hunan Great Steel Pipe Co., Ltd
anti-corrosion steel pipe,alloy steel seamless pipes,oil pipe,drill pipe

Submerged arc steel pipe forming method

Date: 2023-11-30
Submerged arc steel pipe forming method Submerged arc steel pipe forming methods include continuous twist forming (HME), roll forming method (CFE), Uing Oing Expanding forming method (UOE), roll bending forming method (RBE), Jing Cing Oing Expanding forming method (JCOE), etc. However, three forming methods, UOE, RBE, and JCOE, are widely used. 1. UOE forming method: UOE steel pipe unit forming process is divided into three steps to complete, namely pre-bending, U-shaped press forming, and O-shaped press forming, followed by cold expansion of the whole pipe to eliminate the pipe making process The resulting stress. The forming unit has huge equipment and high cost. Each set of forming equipment needs to be equipped with multiple casing inner and outer welders, which has high production efficiency. Due to the profiling, with more forming equipment, a steel pipe of one diameter needs a set of specific forming molds, and these molds need to be replaced when changing product specifications. The internal stress of the formed welded pipe is relatively large, and it is generally equipped with an expanding machine. The UOE unit has mature technology, a high level of automation, and reliable products, but the unit has a huge investment in equipment, which is suitable for the production of large-volume products. 2. RBE forming method: The stages of RBE forming are rolling, bending, and diameter expansion. The production process is mature. In the past, RB was mainly used to manufacture pressure vessels, structural steel, and water supply and drainage pipes with larger outer diameters and shorter lengths. Because ordinary enterprises cannot bear the huge investment of UOE pipe making unit, the RBE pipe making unit developed based on RB has the characteristics of small investment, moderate batch, convenient product specification, etc., so it has developed rapidly. The welded pipe produced by this forming process is close to the UOE steel pipe in terms of and performance, so it can replace the UOE welded pipe in most cases. The RBE pipe-making unit uses three-roll rolling to achieve steel pipe forming. The pipe-making process is that the three-roll forming machine rolls the steel plate into a steel pipe with a caliber, and then uses a forming roll to bend the edge of the steel pipe. , And then bend the edge with a forming roll or backbend. Because it is a three-roll continuous roll bending forming, the stress distribution generated during the steel pipe forming process is relatively uniform. However, when changing the product specifications, it is necessary to change the core roll and adjust the lower roll appropriately. A set of core rolls of the forming equipment can take into account the products of several specifications. The disadvantage is that the production scale is small, and the wall thickness and diameter of the steel pipe are greatly restricted due to the influence of the strength and rigidity of the core roller. 3. JCOE forming method: JCOE forming has three stages, that is, the steel plate is first pressed into a J shape, and then pressed into a C shape and an O shape in turn. E stands for diameter expansion. JCOE forming pipe-making unit is developed based on the UOE forming process. It learns from the working principle of U-shape and releases and implements the UOE forming process, which greatly reduces the tonnage of the forming machine and saves equipment investment. The steel pipe produced is the same as the UOE welded pipe, but the output is lower than the UOE welded pipe unit. This process is easy to realize automatic control in the forming process, and the product shape is better. JCOE forming equipment can be roughly divided into two forms, one is bending forming, the other is compression forming. Bending forming is mainly used in the forming process of thick and medium-thick plates, with smaller steps and lower output. The forming process is to roll the two edges of the steel plate into an arc on the bending machine according to the radius of curvature of the welded pipe, and then use the forming machine to press half of the steel plate into a C shape through multiple steps, and then start from the other side of the steel plate Pressing, after multiple stepping presses, the other side of the steel plate is also pressed into a C shape, so that the whole steel plate becomes an open O shape from the surface. Post time: Nov-30-2023

Latest news list

  • stainless seamless steel pipe,high temperature stainless steel pipe,stainless steel pipe selection
    High-temperature piping requires more than simply selecting a stainless steel grade,As temperature increases,material strength,corrosion behavior,thermal expansion,pressure resistance,and long-term stability become increasingly important,For this reason,stainless seamless steel pipe should be selected against the complete service condition rather than temperature alone,
  • stainless seamless steel pipe,stainless seamless steel pipe manufacturing,stainless steel pipe quality control
    Stainless seamless steel pipe is used in chemical processing,oil and gas,power generation,water treatment,food processing,and other applications where material performance and pressure integrity matter,But a finished pipe does not become reliable simply because it is made from stainless steel,Its quality is built through material control,forming,heat treatment,dimensional control,inspection,and traceability,Understanding how stainless seamless steel pipe is manufactured gives engineers and technical buyers a better way to evaluate suppliers beyond price,surface appearance,or a product catalogue,
  • LSAW steel pipe maintenance,LSAW pipe maintenance,LSAW steel pipe inspection,LSAW pipeline maintenance
    Installing a properly specified LSAW steel pipe does not eliminate the need for pipeline maintenance,Once a pipeline enters service,corrosion,coating deterioration,mechanical loading,ground movement,operating changes,and environmental exposure can gradually affect its condition,For large-diameter pipelines,a practical maintenance program should focus on identifying changes early and taking corrective action before a manageable condition develops into an integrity problem,The objective is not simply to inspect the pipe,It is to understand the condition of the complete pipeline system and respond based on evidence,
  • LSAW steel pipe,LSAW steel pipe for high pressure,high-pressure pipeline,LSAW pipe wall thickness
    High-pressure pipeline systems place demanding requirements on pipe material,dimensions,weld integrity,inspection,and operating conditions,For large-diameter pipelines,LSAW steel pipe can be an effective solution because its manufacturing process allows large outside diameters and substantial wall thicknesses to be produced from steel plate,However,selecting LSAW steel pipe for pressure service is not simply a matter of choosing a thicker wall,The pipe specification needs to match the actual design pressure,temperature,fluid,diameter,applicable code,and service environment,
  • LSAW steel pipe corrosion,LSAW steel pipe coating,3PE coated LSAW steel pipe,FBE coated steel pipe
    LSAW steel pipe is widely used for large-diameter water transmission,buried pipelines,and other infrastructure projects where strength,dimensional control,and long-term service reliability are important,However,pipe strength alone does not prevent corrosion,For buried or water pipeline systems,corrosion protection should be considered from material selection and coating through transportation,field welding,installation,and long-term inspection,A coating system should also be selected according to the actual operating environment rather than simply by initial cost,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.