Product News

Hunan Great Steel Pipe Co., Ltd
plastic coated steel pipe,carbon steel pipe supplier,carbon steel pipe manufacturer

Control Measures for Submerged Arc Steel Pipe Welding

Date: 2023-12-12
Control Measures for Submerged Arc Steel Pipe Welding Submerged arc steel pipe has become the steel pipe of large-scale oil and gas transportation projects at home and abroad due to its large wall thickness, good material quality and stable processing technology. In large-diameter submerged arc steel pipe welded joints, the weld seam and heat-affected zone are the places that are prone to various defects, while welding undercuts, pores, slag inclusions, inadequate fusion, incomplete penetration, weld bumps, burn-through, and welding cracks It is the main form of welding defect, and it is often the origin of accidents of submerged arc steel pipe. The control measures are as follows: 1. Control before welding: 1) The raw materials must be checked first, and only after passing the inspection can they enter the construction site formally, and resolutely use unqualified steel. 2) The second is the management of welding materials. Check whether the welding materials are qualified products, whether the storage and baking system is implemented, whether the surface of the distributed welding materials is clean and rust-free, whether the coating of the welding rod is intact and whether there is mildew. 3) The third is the clean management of the welding area. Check the cleanliness of the welding area, and there should be no dirt such as water, oil, rust and oxide film, which plays an important role in preventing external defects in the weld. 4) To choose a suitable welding method, the principle of first trial welding and subsequent welding should be implemented. 2. Control during welding: 1) Check whether the specifications of the welding wire and flux are correct according to the welding procedure regulations to prevent the wrong use of welding wire and flux and cause welding accidents. 2) Supervise the welding environment. When the welding environment is not good (the temperature is lower than 0℃, the relative humidity is greater than 90%), corresponding measures should be taken before welding. 3) Before pre-welding, check the groove dimensions, including gaps, blunt edges, angles and misalignments, whether they meet the process requirements. 4) Whether the welding current, welding voltage, welding speed and other process parameters selected in the automatic submerged arc welding process are correct. 5) Supervise the welding personnel to make full use of the length of the pilot arc plate at the end of the steel pipe during automatic submerged arc welding, and strengthen the use efficiency of the pilot arc plate during internal and external welding, which helps to improve pipe end welding. 6) Supervise whether the welding personnel first clean up the slag during repair welding, whether the joints have been processed, whether there is oil, rust, slag, water, paint and other dirt at the groove Post time: Dec-12-2023

Latest news list

  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,
  • oil casing manufacturing,API casing production process,oil casing quality control,oil casing threading,API casing inspection
    Oil casing is a critical component of an oil or gas well,Installed inside the wellbore,it supports the well structure and provides a barrier that can be cemented in place to isolate formations,Its performance depends on material properties,dimensional accuracy,connection integrity and compliance with the applicable product specification,For drilling contractors,project engineers and procurement teams,understanding the oil casing manufacturing process helps clarify which production stages and inspection records matter when evaluating a supplier,
  • hollow section inspection,hollow section maintenance,hollow section corrosion,steel structure maintenance
    Steel hollow sections are widely used in buildings,industrial facilities,canopies and other structural applications,Once installed,their condition can change due to weather exposure,coating damage,impact,water accumulation or changes in service conditions,
  • hollow section supply for overseas construction projects,hollow section supplier,square hollow sections,rectangular hollow sections,hollow section export
    International hollow section orders involve more than supplying square or rectangular steel tubes,For overseas construction projects,buyers also need to consider specification compliance,supply coordination,inspection,export documentation,packing and delivery schedules,
  • hollow section service life,hollow section maintenance,hollow section durability,hollow section corrosion control,steel structure
    The service life of square and rectangular hollow section steel structures depends on more than the original steel grade,Environmental exposure,corrosion protection,fabrication quality,loading conditions,and maintenance all influence long-term performance,For building owners,project engineers and maintenance teams,extending service life starts with understanding how these factors interact,Addressing deterioration early can help reduce repair costs,avoid unnecessary downtime and maintain the intended performance of the structure,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.