Price List

Hunan Great Steel Pipe Co., Ltd
stainless steel pipe supplier,seamless steel pipe,anti-corrosion steel pipe

How to control the defects on the inner surface of seamless tube

Date: 2023-01-05
How to control the defects on the inner surface of seamless tube? The scarring defect in the hot continuous rolling seamless tube exists on the inner surface of the steel pipe, which is similar to the pit of the size of a soybean grain. Most of the scars have gray-brown or gray-black foreign matter. The influencing factors of internal scarring include: deoxidizer, injection process, mandrel lubrication and other factors. Let’s follow the carbon steel tube manufacturer to see how to control the inner surface defects of seamless steel tubes: 1. Deoxidizer The oxide is required to be in a molten state when the mandrel is pre-pierced. Its strength and other strict requirements. 1) The particle size of the deoxidizer powder is generally required to be around 16 mesh. 2) The content of sodium stearate in the scavenging agent should reach more than 12%, so that it can fully burn in the capillary lumen. 3) Determine the injection amount of the deoxidizer according to the inner surface area of the capillary, generally 1.5-2.0g/dm2, and the amount of the deoxidizer sprayed by the capillary with different diameters and lengths is different. 2. Injection process parameters 1) The injection pressure should be matched with the diameter and length of the capillary, which not only ensures powerful blowing and sufficient combustion, but also prevents the incompletely burned scavenger from being blown away from the capillary by the airflow. 2) The purging time of the seamless steel pipe manufacturer should be adjusted according to the directness and length of the capillary, and the standard is that there is no suspended metal oxide in the capillary before being blown out. 3) The height of the nozzle should be adjusted according to the capillary diameter to ensure good centering. The nozzle should be cleaned once every shift, and the nozzle should be removed for cleaning after a long shutdown. In order to ensure that the deoxidizing agent is evenly blown on the inner wall of the capillary, an optional device is used at the station for blowing the deoxidizing agent, and it is equipped with a rotating air pressure. 3. Mandrel lubrication If the lubrication effect of the mandrel is not good or the temperature of the mandrel lubricant is too low, internal scarring will occur. In order to increase the temperature of the mandrel, only one cooling water cooling method can be adopted. During the production process, it is necessary to strictly control the temperature of the mandrel to ensure that the surface temperature of the mandrel is 80-120°C before spraying the lubricant, and the temperature of the mandrel should not be higher than 120°C for a long time, so as to ensure that the lubricant on the surface is dry and dense before pre-piercing , The operator should always check the lubrication condition of the mandrel. Post time: Jan-05-2023

Latest news list

  • stainless seamless steel pipe,high temperature stainless steel pipe,stainless steel pipe selection
    High-temperature piping requires more than simply selecting a stainless steel grade,As temperature increases,material strength,corrosion behavior,thermal expansion,pressure resistance,and long-term stability become increasingly important,For this reason,stainless seamless steel pipe should be selected against the complete service condition rather than temperature alone,
  • stainless seamless steel pipe,stainless seamless steel pipe manufacturing,stainless steel pipe quality control
    Stainless seamless steel pipe is used in chemical processing,oil and gas,power generation,water treatment,food processing,and other applications where material performance and pressure integrity matter,But a finished pipe does not become reliable simply because it is made from stainless steel,Its quality is built through material control,forming,heat treatment,dimensional control,inspection,and traceability,Understanding how stainless seamless steel pipe is manufactured gives engineers and technical buyers a better way to evaluate suppliers beyond price,surface appearance,or a product catalogue,
  • LSAW steel pipe maintenance,LSAW pipe maintenance,LSAW steel pipe inspection,LSAW pipeline maintenance
    Installing a properly specified LSAW steel pipe does not eliminate the need for pipeline maintenance,Once a pipeline enters service,corrosion,coating deterioration,mechanical loading,ground movement,operating changes,and environmental exposure can gradually affect its condition,For large-diameter pipelines,a practical maintenance program should focus on identifying changes early and taking corrective action before a manageable condition develops into an integrity problem,The objective is not simply to inspect the pipe,It is to understand the condition of the complete pipeline system and respond based on evidence,
  • LSAW steel pipe,LSAW steel pipe for high pressure,high-pressure pipeline,LSAW pipe wall thickness
    High-pressure pipeline systems place demanding requirements on pipe material,dimensions,weld integrity,inspection,and operating conditions,For large-diameter pipelines,LSAW steel pipe can be an effective solution because its manufacturing process allows large outside diameters and substantial wall thicknesses to be produced from steel plate,However,selecting LSAW steel pipe for pressure service is not simply a matter of choosing a thicker wall,The pipe specification needs to match the actual design pressure,temperature,fluid,diameter,applicable code,and service environment,
  • LSAW steel pipe corrosion,LSAW steel pipe coating,3PE coated LSAW steel pipe,FBE coated steel pipe
    LSAW steel pipe is widely used for large-diameter water transmission,buried pipelines,and other infrastructure projects where strength,dimensional control,and long-term service reliability are important,However,pipe strength alone does not prevent corrosion,For buried or water pipeline systems,corrosion protection should be considered from material selection and coating through transportation,field welding,installation,and long-term inspection,A coating system should also be selected according to the actual operating environment rather than simply by initial cost,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.