Product News

Hunan Great Steel Pipe Co., Ltd
seamless pipe,api casing and tubing,ERW steel pipe supplier

Pipeline weld inspection process

Date: 2021-09-24
Pipeline weld inspection process Pressure pipe weld appearance basic requirements Before pressure pipeline do the nondestructive testing, visual inspection of weld inspection ruler should meet the requirements. General requirements for pressure pipe weld appearance and surface quality of welded joints are as follows: welding should look good shape, width of each side edge bevel overshadowed 2mm appropriate. Fillet weld leg length should meet the design requirements, the level of regulation of small form factor should be smooth transition. Welded joint surface does not allow cracks, lack of fusion, porosity, slag, spatter exist. Pipeline design temperature is below -29 degrees, fan ruler of hardened stainless steel and alloy steel pipes tend to be larger weld surface, without undercut. Pipe weld undercut other materials should be greater than the depth of 0.5mm, continuous undercut length should not exceed 100mm, and both sides of the weld undercut grow at 10 percent of the total weld length. Weld surface not less than the pipe surface. Weld reinforcement, And no more than 3mm, (to a maximum width of weld joints on the groove). Welded joints wrong side wall thickness should not exceed 10% and not more than 2mm. On the surface of nondestructive testing Surface pressure pipeline NDT method selection principle: magnetic iron pipe should be used in magnetic particle testing; non-ferromagnetic steel should be used in penetration testing. There is a tendency to delayed cracking of welded joints, the surface should be non-destructive testing of cooling after welding certain time; reheat cracking tendency of welded joints, the surface should be in non-destructive testing and post-weld heat treatment once each. Ray inspection and ultrasonic testing Ray inspection and ultrasonic testing is the main target of the butt joint pressure pipe and pipe fittings for butt joints. NDT methods chosen by the design documents. Titanium, aluminum and aluminum alloy, copper and copper alloys, welded joints to detect nickel and nickel alloys, and should be used in radiation detection methods. There is a tendency to delay weld cracks, its ray inspection and ultrasonic testing should be at a certain time of cooling after welding. When the head of a folder inside the casing has a girth weld, the weld should be operating 100% ray detection, covert operations can be carried out after passing through the pressure test. Reinforcement rings or bearing plate is covered with welded joints shall be 100% of the pipe-ray inspection, after passing then covered. Examination of the provisions of the middle seam welding, non-destructive testing should be carried out after passing visual inspection, radiography and ultrasonic testing should be performed after the surface of the non-destructive testing, the test weld seam may continue after assessing eligibility. Post time: Sep-24-2021

Latest news list

  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,
  • oil casing manufacturing,API casing production process,oil casing quality control,oil casing threading,API casing inspection
    Oil casing is a critical component of an oil or gas well,Installed inside the wellbore,it supports the well structure and provides a barrier that can be cemented in place to isolate formations,Its performance depends on material properties,dimensional accuracy,connection integrity and compliance with the applicable product specification,For drilling contractors,project engineers and procurement teams,understanding the oil casing manufacturing process helps clarify which production stages and inspection records matter when evaluating a supplier,
  • hollow section inspection,hollow section maintenance,hollow section corrosion,steel structure maintenance
    Steel hollow sections are widely used in buildings,industrial facilities,canopies and other structural applications,Once installed,their condition can change due to weather exposure,coating damage,impact,water accumulation or changes in service conditions,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.