Price List

Hunan Great Steel Pipe Co., Ltd
casing and tubing,lsaw pipe,304 stainless steel pipe

LSAW Steel Pipe Price July 15th 2021

Date: 2021-07-16
LSAW Steel Pipe Price July 15th 2021 Post time: Jul-16-2021 API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE EXW EXW Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 406 457 508 609.6 711.1 762 812 863.6 Wall 8 1,080 1,072 1,080 1,064 1,064 1,064 1,064 1,064 Thickness 9.53 1,072 1,056 1,064 1,041 1,041 1,041 1,041 1,041 壁厚 (mm) 10 1,033 1,017 1,025 1,041 1,041 1,041 1,041 1,041 12 1,033 1,017 1,025 1,041 1,041 1,041 1,041 1,041 14 1,033 1,017 1,025 1,041 1,041 1,041 1,041 1,041 16 1,033 1,033 1,041 1,025 1,025 1,025 1,025 1,025 18 / 1,033 1,041 1,025 1,025 1,025 1,025 1,025 20 / / 1,041 1,025 1,025 1,025 1,025 1,025 22 / / 1,041 1,025 1,025 1,025 1,025 1,025 24 / / 1,041 1,025 1,025 1,025 1,025 1,025 26 / / / 1,041 1,025 1,025 1,025 1,025 28 / / / / 1,025 1,025 1,025 1,025 30 / / / / 1,025 1,025 1,025 1,025 32 / / / / 1,041 1,041 1,041 1,041 34 / / / / / / 1,041 1,041 36 / / / / / / 1,041 1,041 38 / / / / / / / / 40 / / / / / / / / EXW EXW Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) USD/TON USD/TON 914 1016 1066.7 1117.6 1219.2 1320.8 1422.4 / Wall 8 1064 1064 1072 1072 / / / / Thickness 9.53 1064 1064 1064 1064 1064 1119 1103 / 壁厚 (mm) 10 1041 1041 1048 1048 1048 1134 1134 / 12 1041 1041 1033 1033 1033 1072 1134 / 14 1041 1041 1033 1033 1033 1072 1134 / 16 1025 1048 1033 1033 1033 1072 1127 / 18 1025 1048 1033 1033 1033 1072 1127 / 20 1025 1048 1033 1033 1033 1072 1127 / 22 1025 1048 1033 1033 1033 1072 1127 / 24 1025 1048 1033 1033 1033 1072 1127 / 26 1025 1048 1033 1033 1033 1072 1127 / 28 1009 1033 1017 1017 1017 1072 1127 / 30 1009 1033 1048 1048 1048 1072 1127 / 32 1025 1048 1048 1048 1048 1088 1134 / 34 1025 1048 1056 1056 1056 1088 1134 / 36 1025 1048 1056 1056 1056 1088 1134 / 38 1025 1048 1056 1056 1056 1088 1134 / 40 / / / / / 1088 1134 / Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 3. The above price is NOT including any packing and end processing charge; 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us; 6. For more information and CIF price,please contact us;

Latest news list

  • oil casing corrosion,sour service casing,CO₂ corrosion in oil wells,H₂S material selection,oil well corrosion management,casing integrity
    Oil casing in corrosive well environments must meet both mechanical design requirements and the demands of the service environment,Carbon dioxide (CO₂),hydrogen sulfide (H₂S),chlorides,water chemistry and temperature can influence corrosion behavior and material suitability,Choosing a casing grade based on strength alone may leave important risks unaddressed,
  • how to choose oil casing,oil casing selection,oil casing buying guide,oil casing procurement,oil casing specifications
    Choosing the right oil casing requires more than matching a nominal diameter or selecting a higher-strength steel grade,Casing must meet the well design,expected mechanical loads,connection requirements and service environment,For drilling contractors,EPC procurement teams and international buyers,confirming these requirements before ordering helps reduce specification errors,delivery delays and costly changes during project execution,
  • oil casing failure signs,casing integrity problems,annular pressure monitoring,oil well casing damage,casing failure diagnosis,oil casing inspection
    Oil casing provides structural support and helps maintain well integrity throughout drilling and production,When casing or related well barriers deteriorate,the consequences may include leakage,operational interruptions and increased safety risks,However,casing damage is not always visible at the surface,and early warning signs do not necessarily confirm a failure,
  • oil casing quality control,oil casing inspection,oil casing testing,casing pipe quality requirements
    Oil casing quality must be verified against the requirements agreed for the order,including steel grade,dimensions,connections,inspection scope and documentation,Before shipment,buyers need to know not only whether the product has been inspected,but also whether the required tests are complete,the results meet the specified acceptance criteria,and the records correspond to the supplied materials,
  • casing damage during cementing,oil casing cementing,casing running problems,casing connection inspection,well casing integrity
    Casing damage during cementing can complicate well construction,delay subsequent operations and raise concerns about well integrity,Although cementing helps support the casing string and isolate formations,the operation involves mechanical loads,fluid pressure and coordination between drilling and cementing teams,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.