Price List

Hunan Great Steel Pipe Co., Ltd
seamless steel pipe,alloy pipe,drill pipe

ASTM A234 WPB pipe fittings

Date: 2021-10-08
ASTM A234 WPB pipe fittings About ASTM A234 WPB pipe fittings ASTM A234 is Standard Specification for steel pipe fittings includes carbon and alloy steel material for moderate and high temperature services. It covers steel fittings of seamless and welded types. Steel Pipe fittings are applied in pressure pipelines and in pressure vessel fabrications. These fittings material consist of killed steel, forgings, bars, plates, seamless or HFW (fusion welded) pipe products, with filler metal added. What is WPB? W = WELDABLE / wrought P = RELATED TO P NUMBER OF ALLOY MATERIAL B = REFER TO MINIMUM YIELD OF MATERIAL They are available in latest revision of ASME B16.9, B16.11, MSS-SP-79, MSS-SP-83, MSS-SP-95, and MSS-SP-97. Also widely used in pressure piping and in pressure vessel fabrication for service at moderate and elevated temperatures. The grades are ASTM A234 WPB, WPC, WP5, WP9, WP91, WP11, WP12 and WP22. Specifications: Standards: ANSI /ASME B16.9, B16.28, MSS-SP-43. Outer Diameter Range: 1/2” to 48” Thickness Range: SCH 10, sch 20, SCH 40, SCH STD, SCH 80, SCH XS, SCH 160, SCH XXS etc. Steel pipe fittings manufacturing types in forged, threaded, butt weld, and seamless. Chemical Composition (%) of ASTM A234 Mechanical properties of ASTM A234 A234 WPB Equivalent (1)The sum of Cu, Ni, Cr, and Mo shall not exceed 1.00%. (2)The sum of Cr and Mo shall not exceed 0.32%. (3)For each reduction of 0.01% below the specified C max., an increase of 0.06% Mn (4)above the specified max. will be permitted, up to a max. of 1.35%. (5)The max. carbon equivalent (C.E.) shall be 0.50, based on heat analysis and the (6)formula C.E.=C+Mn/6+(Cr+Mo+V)/5+(Ni+Cu)/15. The Difference Between A105 And A234 ASTM A234 WPB Pipe Fittings are made up of wrought carbon steel that they are very strong and can be applied in high strength requirements. The ASTM A234 WPB are heat treated and then allowed to cool rapidly. Carbon Steel Forged Fittings are pipe fittings made out of A105 Material. These are produced in annealed, normalized, normalized and tempered or quenched and tempered conditions. Post time: Oct-08-2021 Grade C Mn P S Si Cr Mo Ni Cu V Nb WPB 0.3 0.29-1.06 0.05 0.058 0.1min 0.4 0.15 0.4 0.4 0.08 0.02 WPC 0.35 0.29-1.06 0.05 0.058 0.1min 0.4 0.15 0.4 0.4 0.08 0.02 WP11 CL1 0.05-0.15 0.30-0.60 0.03 0.03 0.50-1.00 1.00-1.50 0.44-0.65 - - - - WP11 CL2/3 0.05-0.20 0.30-0.80 0.04 0.04 0.50-1.00 1.00-1.50 0.44-0.65 - - - - Tensile Requirements WPB WPC, WP11CL2 WP11CL1 WP11CL3 Tensile Strength, min, ksi[MPa] 60-85 70-95 60-85 75-100 (0.2% offset or 0.5% extension-under-load) [415-585] [485-655] [415-585] [520-690] Yield Strength, min, ksi[MPa] 32 40 30 45 Yield Strength, min, ksi[MPa] [240] [275] [205] [310] Pipe Fittings Flanges Valves Bolts & Nuts ASTM A106 Gr A ASTM A234 Gr WPA ASTM A105 ASTM A216 Gr WCB A193 Gr B7 A194 Gr 2H ASTM A106 Gr B A234 Gr WPB ASTM A105 ASTM A216 Gr WCB A193 Gr B7 A194 Gr 2H ASTM A106 Gr C ASTM A234 Gr WPC ASTM A105 ASTM A216 Gr WCB A193 Gr B7 A194 Gr 2H

Latest news list

  • drill pipe storage and handling,drill pipe transportation,drill pipe thread protectors,drill pipe handling procedures,drill pipe preservation
    Drill pipe must remain in suitable condition throughout storage,handling and transportation,Even when a joint has passed its required manufacturing inspection,poor handling can damage the pipe body,tool joints or threaded connections before the equipment reaches the drilling site,Impact,moisture,contamination,improper stacking and inadequate load securing are common sources of avoidable damage,A controlled storage and transportation plan helps preserve product condition and reduces the risk of problems during rig preparation,
  • drill pipe export supply,drill pipe shipment,international drill pipe supplier,drilling project procurement
    International drilling projects require more than finding a supplier with available drill pipe,Buyers must confirm technical specifications,coordinate product sourcing,arrange inspection,review documentation and manage transportation to the final destination,For bulk orders and project-based procurement,these activities need to remain consistent from the initial inquiry through final delivery,A structured export process helps reduce specification discrepancies,documentation errors and avoidable delays,
  • drill pipe corrosion and washout,drill pipe washout,drill pipe erosion,drill pipe corrosion prevention,drill pipe inspection
    Drill pipe operates under repeated mechanical loads and continuous exposure to drilling fluids,abrasive solids and changing downhole conditions,Over time,these factors can contribute to corrosion,erosion and localized wall loss,In severe cases,material deterioration or mechanical damage may create a hole in the pipe body or a leak at a connection,This condition is commonly described as a drill pipe washout,Understanding the differences between corrosion,erosion and washout helps drilling teams identify potential damage and establish appropriate inspection and maintenance procedures,
  • new vs used drill pipe,drill pipe buying guide,drill pipe inspection,drill pipe procurement,drill pipe traceability
    When purchasing drill pipe,buyers often compare new and used products to balance technical requirements,availability and procurement costs,New drill pipe offers a defined manufacturing history,while used drill pipe may provide a lower initial purchase price if its condition is properly inspected and verified,However,the lowest purchase price does not necessarily represent the best value,The right choice depends on the drilling program,operating conditions,equipment compatibility and the acceptance criteria agreed before purchase,
  • drill pipe fatigue,drill pipe failure,drill string,drill pipe inspection,drill pipe cracks,rotating bending fatigue
    Drill pipe operates under repeated tensile,torsional,bending and dynamic loads throughout drilling operations,Over time,these cyclic stresses can cause fatigue damage,particularly in areas exposed to high stress or local surface defects,Unlike sudden overload failure,fatigue develops progressively,Small cracks may initiate at stress concentration points and grow with repeated loading,If the damage is not identified in time,it can eventually lead to pipe failure,drilling fluid leakage and unplanned downtime,Understanding how drill pipe fatigue develops,where damage may occur and how to inspect for potential defects helps drilling teams manage equipment reliability,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.