Product News

Hunan Great Steel Pipe Co., Ltd
ERW steel pipe manufacturer,SSAW steel pipe provider,api 51 line pipe

SSAW Steel Pipe Price July 15th 2021

Date: 2021-07-16
SSAW Steel Pipe Price July 15th 2021 Post time: Jul-16-2021 API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE API 5L/ASTM A53 GR.B, CARBON STEEL, SSAW STEEL PIPE EXW USD/TON EXW USD/TON Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) EXW USD/TON EXW USD/TON 219 273 324 356 406 457 508 610 711 762 813 914 Wall Thickness 6 984 984 984 984 984 984 984 984 984 984 984 984 壁厚 (mm) 7 984 984 984 984 984 984 984 984 984 984 984 984 8 984 984 984 984 984 984 984 984 984 984 984 984 9 984 984 984 984 984 984 984 984 984 984 10 984 984 984 984 984 984 984 984 984 984 11 984 984 984 984 984 984 984 984 984 984 12 984 984 984 984 984 984 984 984 984 984 13 994 1000 1000 1000 1000 14 994 1000 1000 1000 1000 15 1013 16 1013 EXW USD/TON EXW USD/TON Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) Outside Diameter 外径 (mm) EXW USD/TON EXW USD/TON 1016 1067 1118 1168 1219 1321 1422 1524 1626 1727 1829 1930 Wall Thickness 6 984 1000 1000 1000 1000 1000 1000 壁厚 (mm) 7 984 1000 1000 1000 1000 1000 1000 1008 1008 8 984 1000 1000 1000 1000 1000 1000 1008 1008 9 984 1000 1000 1000 1000 1000 1000 1008 1008 10 984 1000 1000 1000 1000 1000 1000 1008 1008 11 984 1000 1000 1000 1000 1000 1000 1008 1008 1008 1016 1016 12 984 1000 1000 1000 1000 1000 1000 1008 1008 1008 1016 1016 13 1000 1016 1016 1016 1016 1016 1016 1020 1020 1020 1020 1044 14 1000 1016 1016 1016 1016 1016 1016 1020 1020 1020 1020 1044 15 1013 1028 1028 1028 1028 1028 1028 1036 1036 1036 1036 1059 16 1013 1028 1028 1028 1028 1028 1028 1036 1036 1036 1036 1059 17 1028 1028 1028 1044 1044 1091 1091 1091 18 1028 1028 1028 1044 1044 1091 1091 1091 19 1091 1091 20 1091 1091 Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: Note: 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 1. The above price is based on BARE pipes; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 2. The above price is based on EXW; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 3. The above price is not including any packing and end processing charge; 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 4. The above price is only valid during 7.15-7.22 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 5. The applicapable MOQ for this price list is over 25 tons; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us; 6. For more information and CIF price, please contact us;

Latest news list

  • stainless welded steel pipe maintenance shutdown,stainless steel pipe replacement,plant shutdown piping
    A plant shutdown creates a limited window for inspection,maintenance and piping replacement,When stainless steel piping needs to be repaired or replaced,delays in material procurement or specification confirmation can quickly affect the shutdown schedule,A practical shutdown strategy starts before equipment is taken offline,Identifying critical pipe sections,confirming replacement specifications and securing materials in advance can help maintenance teams reduce avoidable delays and prepare the system for a controlled restart,
  • stainless welded steel pipe shipment,stainless steel pipe export,stainless welded pipe delivery
    For an overseas stainless welded steel pipe order,delivery does not begin when the cargo reaches the port,It starts with accurate specification confirmation and continues through production,inspection,packing,documentation and logistics coordination,For EPC contractors,fabricators,distributors and project buyers,each stage can affect the final delivery schedule,A well-managed shipment therefore requires technical and commercial information to remain consistent from the purchase order to the final dispatch,
  • stainless welded steel pipe maintenance,stainless steel pipe maintenance guide,stainless piping inspection
    Stainless welded steel pipe provides good corrosion resistance in many industrial applications,but stainless steel piping should not be treated as maintenance-free,Process fluids,deposits,contamination,mechanical stress,temperature changes and operating conditions can all affect piping performance,A practical maintenance program helps identify deterioration before it develops into leakage,unplanned shutdowns or costly replacement work,
  • stainless welded steel pipe buying guide,stainless steel pipe export supplier,stainless steel pipe procurement
    Buying stainless welded steel pipe for an overseas project involves more than comparing product prices,The final procurement result can also depend on specification accuracy,inspection,documentation,packing,transportation and delivery timing,For EPC contractors,distributors and international project buyers,a complete purchasing process should connect the technical specification with the supply and logistics plan,
  • stainless welded steel pipe chemical industry,stainless steel process piping,stainless steel pipe failure prevention
    Chemical processing plants can expose piping systems to corrosive chemicals,elevated temperatures,pressure changes,deposits and repeated cleaning cycles,Stainless welded steel pipe can perform reliably in many of these environments,but material selection and fabrication must match the actual process conditions,Preventing piping problems starts before installation,The chemical service,pipe specification,weld quality,surface condition and operating conditions should all be considered as part of the system design,

Find what you need ?

close
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from.