Pickling passivation method for sanitary stainless steel pipeline

Date: 2023-11-24
Pickling passivation method for sanitary stainless steel pipeline 1. Range of cleaning passivation: pipelines, fittings, valves, etc. belonging to the purified water pipes constructed by our company. 2. Water requirements: The water used in all the following process operations is deionized water, and Party A is required to cooperate in water production operations. 3. Safety precautions: The following safety precautions are adopted in the pickling liquid: (1) The operator wears a clean, transparent gas mask, acid-proof clothing, and gloves. (2) All operations are to add water to the container first, and then add chemicals, not the other way around, and stir while adding. (3) The cleaning and passivation liquid must be discharged when it is neutral, and the discharge must be discharged from the sewage outlet of the water production room to benefit the environment. Cleaning plan 1. Pre-cleaning (1) Formula: Deionized water at room temperature. (2) Operation procedure: Use a circulating water pump to keep the pressure at 2/3bar and circulate with a water pump. After 15 minutes, open the drain valve and discharge while circulating. (3) Temperature: room temperature (4) Time: 15 minutes (5) Drain the deionized water for cleaning. 2. Lye cleaning (1) Formula: Prepare a pure chemical reagent of sodium hydrochloride, add hot water (temperature not lower than 70℃) to make 1% (volume concentration) lye. (2) Operating procedure: Circulate with a pump for no less than 30 minutes, and then discharge. (3) Temperature: 70℃ (4) Time: 30 minutes (5) Drain the cleaning solution. 3. Rinse with deionized water: (1) Formula: Deionized water at room temperature. (2) Operation procedure: Use a circulating water pump to keep the pressure at 2/3bar to circulate with a water pump. After 30 minutes, open the drain valve and discharge while circulating. (3) Temperature: room temperature (4) Time: 15 minutes (5) Drain the deionized water for cleaning. Passivation scheme 1. Acid passivation (1) Formula: Use deionized water and chemically pure nitric acid to prepare an 8% acid solution. (2) Operation procedure: Keep the circulating water pump at 2/3bar pressure and circulate for 60min. After 60 minutes, add proper sodium hydroxide until the PH value is equal to 7, open the drain valve, and discharge while circulating. (3) Temperature: 49℃-52℃ (4) Time: 60 minutes (5) Let go of the passivation solution. 2. Purified water rinse (1) Formula: Deionized water at room temperature. (2) Operation procedure: Use a circulating water pump to keep the pressure at 2/3bar to circulate with a water pump, open the drain valve after 5 minutes, and discharge while circulating. (3) Temperature: room temperature (4) Time: 5 minutes (5) Drain the deionized water for cleaning. 3. Rinse with purified water (1) Formula: Deionized water at room temperature. (2) Operation procedure: Keep the circulating water pump at 2/3bar pressure and circulate with the water pump until the effluent pH is neutral. (3) Temperature: room temperature (4) Time: no less than 30 minutes (5) Drain the deionized water for cleaning. Note: When cleaning and passivating, the filter element of the precision filter must be removed to avoid damage to the filter element Post time: Nov-24-2023

Latest news list

  • 3PE anti corrosion steel pipe,3PE coated steel pipe,pipeline corrosion protection,3PE coating layer
    External corrosion is an important consideration for steel pipelines exposed to soil,moisture,salts,groundwater,and other aggressive conditions,For long-distance and buried pipelines,corrosion protection should not be treated as a maintenance issue alone,It needs to be considered from pipeline design and procurement through coating application,installation,and operation,3PE anti corrosion steel pipe provides a multilayer external barrier that helps reduce the steel surface's exposure to the surrounding environment,However,its effectiveness depends on coating quality,installation practices,field joint protection,and the overall corrosion-control strategy,
  • 3PE anti corrosion steel pipe,3PE coating quality control,3PE coating inspection,3PE steel pipe quality
    3PE anti corrosion steel pipe is widely used for buried and submerged pipeline systems because its external coating helps protect the steel substrate from moisture,soil,and other external corrosion risks,However,a good-looking coating does not necessarily mean a qualified coating system,Surface preparation,coating thickness,adhesion,continuity,pipe-end condition,repair,and documentation all need to be controlled,For this reason,3PE quality control should cover the complete production and inspection process rather than relying on final visual appearance alone,
  • 3PE anti corrosion steel pipe,3PE coated steel pipe,3PE coating,3PE steel pipe application
    Buried steel pipelines operate in an environment that is difficult to control,After installation,the pipe may remain in contact with soil,moisture,groundwater,salts,and other external conditions for many years,Without suitable external corrosion protection,the exposed steel surface can gradually deteriorate,This is why 3PE anti corrosion steel pipe is widely considered for buried pipeline systems,Its three-layer external coating creates a protective barrier between the steel surface and the surrounding environment while also providing additional mechanical protection during handling and installation,
  • 3PE anti corrosion steel pipe,3PE coated steel pipe,3PE coating process,anti corrosion steel pipe
    3PE anti corrosion steel pipe is widely used for buried pipelines,water transmission,oil and gas transportation,and infrastructure projects where steel pipes are exposed to moisture,soil,salts,and other external corrosion risks,A 3PE coating is more than a polyethylene outer layer,Its performance depends on the condition of the steel surface,the fusion-bonded epoxy (FBE) primer,the adhesive layer,the polyethylene outer layer,and the inspection performed throughout production,Understanding the manufacturing process helps engineers and buyers evaluate 3PE coated steel pipe before placing an order,
  • stainless seamless steel pipe stock,stainless seamless steel pipe supplier,stainless steel pipe procurement
    When an industrial project is already underway,waiting for a full production cycle is not always practical,Maintenance shutdowns,replacement requirements,construction delays,and additional project quantities can create an immediate need for stainless seamless steel pipe,In these situations,available stock can provide a shorter procurement route—provided the material matches the project specification,For urgent orders,speed matters,but specification,traceability,inspection,and delivery control should not be overlooked,